Orange County NC Website
/~ <br />ATTACHMENT 4b <br />COST ESTIMATE SUMMARY <br />BELOW PHASE 4 /S NOT SUGGESTED AT TH/S TIME: <br />This phase and Phase 3 are part of the comprehensive infrastructure master <br />plan of the entire Buckhorn-Mebane EDD area. <br />PHASE 4 -Buckhorn EDD, Southeast Quadrant; Eastern Extension (75 acres) <br />(Note: Presently not part of Orange County/City of Mebane Utility Agreement) <br />a. Sewer; <br />i. 2800 Linear Foot of 4" Sewer Force Main; New Pump station #2. <br />ii. Estimated construction cost - $342,890. <br />iii. Estimated design cost: $14,980 (doesn't include pump station <br />design cost) <br />b. Water; <br />i. 3300 Linear Foot of Water Main; <br />ii. Estimated construction cost - $188,000. <br />iii. Estimated design cost: $15,180. <br />