Orange County NC Website
ICS <br />ATTACHMENT 3c <br />COST ESTIMATE SUMMARY <br />BELOW PHASE 3 /S NOT SUGGESTED AT TH/S TIME: <br />This phase and Phase 4 are part of the comprehensive infrastructure master <br />plan of the entire Buckhorn-Mebane EDD area. <br />PHASE 3 - Buckhorn Economic Development District (EDD), Northeast <br />Quadrant <br />(246 acres aka Orange County/City of Mebane Utility Agreement Area 2a) <br />a. Sewer <br />i. 7200 Linear Foot of 8" Sanitary Sewer; Gravelly Hill Pump station <br />replacement. <br />ii. Estimated construction cost: $848,000. <br />iii. Estimated design cost: $38,520. (doesn't include pump station <br />design cost) <br />iv. 2080 Linear Foot of 8" Sanitary Sewer; <br />v. Estimated construction cost: $87,110. <br />vi. Estimated design cost: $11,128 <br />b. Water <br />i. 7000 Linear Foot of 16" Water Main; <br />ii. Estimated construction cost - $532,000. <br />iii. Estimated design cost: $32,200 <br />