Browse
Search
Agenda - 01-21-2010 - 6e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 01-21-2010 - Regular Mtg.
>
Agenda - 01-21-2010 - 6e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2010 3:00:57 PM
Creation date
1/15/2010 3:00:54 PM
Metadata
Fields
Template:
BOCC
Date
1/21/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6e
Document Relationships
Minutes 01-21-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Sewer <br />Service Area <br />VS ~0 158 Acres <br />Rq/LRpgD <br />Proposed 7,200 LF of <br />8" Gravity Sewer <br />t $~ Estimated Cost <br />Gravelly Hill Pump Station Replacement <br />Ultimate Capacity: 700 G.P.M. <br />Type: Built-In-place <br />Estimated Cost: <br />Sewer Service Area <br />• Proposed Sewer Manfwk <br />t~Proposed Gravity Sewer <br />~ Proposed Force Sewer <br />• Fxiatirp Swier ManAde <br />~ Existirq Graviy sewer <br />Exiatirp Sower Pump Station <br />EDD <br />Phase 3 N <br />Map produced by Summit Consulting Engineers <br />BUCKHORN EDD ~ 11700 Corporate Drive, suite tot <br />H*sborough, NC 27278 <br />Voice: (919) 732-3883 Fax: (919) 732-6676 <br />Sanitary Sewer 1 inch equals t,ao0 feet wwwsummlt~ngineer.com <br />D <br />N <br />A <br />s <br />fD <br />7 <br />W <br />01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.