Orange County NC Website
l3 <br />ATTACHMENT 2c <br />COST ESTIMATE SUMMARY <br />PHASE 2 - Buckhorn EDD, SE Quadrant <br />(aka Orange County/City of Mebane Utility Agreement Area 1 a) <br />(Proposed - 446 ~ acres) <br />a. Sewer <br />1. 7600 Linear Foot of 10" Sanitary Sewer (SS) <br />2. 20,000 Linear Foot of 8 "-10" Sewer Force Main <br />3. Estimated construction cost: $1,156,000 <br />4. Estimated design cost: $147,660 <br />b. Water <br />1. 11,000 Linear Foot of 16" Water Main <br />2. Estimated construction cost: $945,000 <br />3. Estimated design cost: $50,600 <br />SUBTOTALS [approximate] <br />SEWER AND WATER CONSTRUCTION COST: $2,101,000 <br />SEWER AND WATER ENGINEERING DESIGN COST: $198,260 <br />