Browse
Search
Agenda - 01-21-2010 - 6e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 01-21-2010 - Regular Mtg.
>
Agenda - 01-21-2010 - 6e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2010 3:00:57 PM
Creation date
1/15/2010 3:00:54 PM
Metadata
Fields
Template:
BOCC
Date
1/21/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6e
Document Relationships
Minutes 01-21-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
185 <br /> <br /> Existing Gravity Sewer to <br /> City of Mebane Industrial <br />w <br />Drive Pump Station <br />z <br /> <br />~ WEST T <br /> Fro <br />0 <br />~ ~ <br /> <br />Existing City c <br />n <br /> of Mebane <br /> Southeastern O <br /> Regional Z <br /> Pump Station Proposed 20,000 LF of <br /> 8" -10" Force Sewer <br /> Estimated Cost <br />Legend <br />Q Sewer Service Area <br /> Phase 2 Continued N <br />~ Proposed Force Sewer Map produced by Summit Consulting Engineers <br />Existing Sewer Manhole BUCKHORN EDD ~ 100o Corporate Drive, Suite 101 <br />Existing Gravity Sewer ~J H~sborough, NC 27278 <br /> <br />® E <br />i <br />ti <br />S <br />P <br />S Voice: (919) 732-3883 Fax: (918) 732-6676 <br />wwW summft~n <br />i <br />x <br />s <br />ng <br />ewer <br />ump Station anitary Sewer g <br />neer.com <br />1 inch equals 1,200 feet <br />EDD <br />N <br />n <br />lD <br />7 <br />N <br />G1 <br />N <br />~\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.