Orange County NC Website
The following list includes all destinations, organized by ownership, that are represented by directional signage in the Wayfinding Plan. <br />Town of Hillsborough Orange Countv Non Profit/ Other <br />Cates Creek Park Social Services Durham Technical Community College <br />Cates Creek Greenway Health Department UNC Hospital (Future) <br />Transit SportsPlex Historical Museum <br />Historic Downtown Senior Center Burwell School <br />Town Annex County Campus West HYAA Ball Fields <br />Town Hall Campus Library Speedway Trail <br />Police Substation Courthouse Visitor's Center <br />Gold Park County Campus East Occoneechee Mountain <br />Riverwalk Public Market House Train Station (Future) <br /> Occoneechee Village <br /> Link Center <br /> Board of Elections <br /> Fairview Park <br /> Whiffed Building <br />The costs of developing and implementing the Wayfinding Signage Plan include design fees, fabrication, and installation. The Wayfinding <br />Task Force and Town of Hillsborough Planning Department staff developed the plan in house, saving the costs of hiring a planning <br />consultant. The total costs of funding the plan are $312,200, which includes $35,000 already paid to Design Workshop for design <br />consultation and development of the design manual. The total costs for fabricating and installing the proximity and trailblazing signs are <br />$151,000. The cost of proximity and trailblazing panels displaying an Orange County destination is $47,661. This figure does not include <br />site signage at Orange County locations. The table below includes a breakdown of proximity and trailblazing panel costs in reference to <br />Orange County destinations. <br /> <br />All Trailblazin and Proximi Si ns Number Cost per Sign Installation <br />Cost Total <br />Cost <br />Trailblazing Signs - Type B 7 $2,000 $1,000 $21,000 <br />Proximity Signs - Type C <br />Proximity Signs - Type D 18 <br />19 $2,000 <br />$3,000 $1,000 <br />$1,000 $54,000 <br />$76,000 <br />Total Cost of Proximi and Trailblazin Si ns <br /> <br />Panels S ecific to Oran a Coun Destinations <br /># of OC Panels <br />Cost per <br />Panel <br />Total Cost $151,000 <br />Trailblazing Signs - Type B 7 $1,000 $7,000 <br />Proximity Signs - Type C 18 $1,000 $18,000 <br />Proximity Signs - Type D 17 $1,333 $22,661 <br />Total Cost of Si n Panels with Oran a Coun Destinations $47,661 <br />rn <br />