Orange County NC Website
SINGLE PRIME GENERAL CONSTRUCTION CONTRACT: <br />Bid: ~ _ <br />~ Doll rs ($ ~ ~.~~~ <br />NOTE: No Contractor whose bid is accepted shall substitute any person as subcontractor in <br />the place of the subcontractor listed in the original bid, except with the approval of <br />the awarding authority for good cause shown by the contractor. (GS 143-128-D) <br />The General Contractor shall act as project expediter for all prime <br />contracts. See Supplementary General Conditions. <br />SP-2 <br />