Browse
Search
2009-104 AMPS - McQueen Construction, Inc. for Twin Creeks Park-Greenway Construction, Phase 1
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-104 AMPS - McQueen Construction, Inc. for Twin Creeks Park-Greenway Construction, Phase 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 9:31:29 AM
Creation date
1/4/2010 4:51:34 PM
Metadata
Fields
Template:
BOCC
Date
12/7/2009
Meeting Type
Regular Meeting
Document Type
Contract
Document Relationships
Agenda - 12-07-2009 - 4i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 12-07-2009
R Purchasing - McQueen Construction Fairview Park
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2009
RES-2009-084 Resolution Authorizing the County Manager to Execute a Contract and Any Change Orders for the Twin Creeks Greenway Project U-4726 GA
(Linked To)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.t <br />Item section <br />21 422 <br />22 <br />23 <br />24 <br />25 <br />26 <br />425, <br />500 <br />520 <br />545 <br />654 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />800 <br />801 <br />848 <br />$48 <br />876 <br />876 <br />876 <br />901 <br />904 <br />1264 <br />1605 <br />1610 <br />16111 <br />1615 <br />1620 <br />1620 <br />1630 <br />1660 <br />1660 <br />Descri tion ~ ~ Unit Price Amount Bid <br />P <br />Bridge Approach Slab <br />at Station 24+18 ~ ~ <br />Reinforcing Steel ~~ UB <br />Fine Grading ~ ~ <br />Aggregate ease course 300 TN <br />incidental Stone Base `~ TN <br />AsphaR Plant Mix. <br />Pavement Repair ~ ~ <br />MobNizatlon 1 ~ <br />Construction Surveying i tS <br />6" Cotwxete Sidewalk 3340 Sl( <br />8' Concrete Sidewalk 180 SY <br />Riprap, Class B 170 TN <br />Riprap, Class A ~ TN <br />Filter Fabric far Drainage 300 ~ <br />Reinforced Endwalis 8 CY <br />Contractor Furnished, <br />Type E Sign ? ~ <br />Sign Eredion; Type E _1 EA <br />7' U-Channel Posts 1 EA <br />Temporary Silt Fence ~ ~ <br />Stone for Erosion Control <br />Cia~ss 8 30 TN <br />Sediment Control Stone ~0 TN <br />Temporary Mulching ~ AC <br />Seed for Temporary Seeding 480 lB <br />F$rtiNzer for Temporary Seedi ng ~, TN <br />Silt Excavation ~ CY <br />~/4" HardWafe Cloth ~ ~ <br />Seed~g and Matching 3~ AC <br />Mowing 5 AC <br />~~~i7.~o <br />. ~' /3~6~fo.oo <br /> 5 3 00 . a o <br />22 - _ _ ~6 ~, ed <br />22-~" /l aD-° ° <br />~pp ~5D" o O <br /> ~; <br />~, DOO " ° o (( 40C~ <br />~; <br /> ~ <br />68.4 •Qo <br /> <br />~$`f ~~ 7 ~' Z O <br />3g a~ ~Sg6- d° <br />~.1~ ~rlO-oC <br /> <br />~f 6C~ - 3 sU-° o <br />~ <br />- ~© <br /> loo <br />Z ' Zd l l f (~Ot2'-' <br /> <br />_ c ~~-?~ ZO f D- o a <br /> ~2E~ oa <br /> -- <br />ti gD_ ll 3 66 (}~ <br />~~ 7~i~ - <br /> 7~1 - <br /> <br />fD0 ~©~ <br />65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.