Browse
Search
2009-104 AMPS - McQueen Construction, Inc. for Twin Creeks Park-Greenway Construction, Phase 1
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-104 AMPS - McQueen Construction, Inc. for Twin Creeks Park-Greenway Construction, Phase 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 9:31:29 AM
Creation date
1/4/2010 4:51:34 PM
Metadata
Fields
Template:
BOCC
Date
12/7/2009
Meeting Type
Regular Meeting
Document Type
Contract
Document Relationships
Agenda - 12-07-2009 - 4i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 12-07-2009
R Purchasing - McQueen Construction Fairview Park
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2009
RES-2009-084 Resolution Authorizing the County Manager to Execute a Contract and Any Change Orders for the Twin Creeks Greenway Project U-4726 GA
(Linked To)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange Countv <br />CONTRACT BID FORM <br />Twin Creeks Greenway <br />to Section <br />1 200 <br />2 200 <br />3 200 <br />4 226 <br />5 226 <br />s 250 <br />7 260 <br />8 265 <br />9 270 <br />10 300 <br />11 300 <br />12 310 <br />13 310 <br />14 310 <br />15 310 <br />16 310 <br />17 412 <br />18 412 <br />19 420 <br />ZO 422 <br />O~ipUpn Q~ Unit Unit Price Amount Bid <br />Clearing anti Grubbing ~ tS ~ ~ • eo <br />Suppiewnentai Gearing and 7 ZG~l • ,,,. ~ G~ - o a <br />Grubbing ~ ~ r ~ <br />Select Tree Removal 4 EA ~_ ~ -~ O O - °a <br /> 1 LS ~~ i7 !1 •- / t27r3 <br />Grading ~'l <br />Undercut Excavation ~ 1,~0 CY I ~ ! 30 o a ~.J~ <br />Removal of Ex. Asphalt Pavement f~5 SY ~_ 2 ~p0 • a a <br />Proof Roiling $ HR I b 0 _ g~ ' o a <br />Select Granular Material, <br />Class 11 or IN (Type 1) <br />11 <br />CY <br />~ ~ - e0 <br />~ D ~ ' O° <br />Fabric for Soil Stabii~ation, <br />~ t .Z CAD , c a <br />Type 4 ~ ~ _ <br />Select Materlat, Clams Il o~ ill 100 TN 2 ~ • SD • ~ o <br />Foundation Conditioning <br />TN <br />2 ~~ <br />~7S <br />Material, Minor Structures. ~ <br />18' Reinforced Pipe Cuhrert, <br />Gass 111 <br />32 <br />LF <br />3~ ' r-- <br />~ j ~ O - ° ~ <br />24" Reinforced Pipe Culvert, <br />Gass 1!I <br />~ <br />!.F <br />t f g'. oo <br />/ lrj :Z - " <br />nforoed Pipe Culvert, ~ g. ~ a 2q 4 ~ • 0 0 <br />Class I I ~ ~ <br />18' Reinforced Concrete Pipe t ~~, .... <br />Sgt. ,^. ~ <br />End Sections ~ EA , <br />24' Reinforced Concrete Pipe <br />d S <br />d <br />1 <br />EA <br />~©' r- <br />?~- .... <br />ections (flare <br />) <br />En <br />Unclassified Structure- ,_„ <br />2 <br />~ Ga • <br />Excavation at Station 23+04 ~ t.S ~ <br />Unclassified Structure °O <br />ZOG © <br />Excavation at Station 24+16 1 L.S , <br />Class AA Concrete Lt CY ~YS_ ~iD 2 ~~• eQ <br />Bridge Approach Stab <br />? ~{ Q • 00 <br />~ <br />at Station 22+88 1 LS . <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.