Browse
Search
2009-104 AMPS - McQueen Construction, Inc. for Twin Creeks Park-Greenway Construction, Phase 1
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-104 AMPS - McQueen Construction, Inc. for Twin Creeks Park-Greenway Construction, Phase 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 9:31:29 AM
Creation date
1/4/2010 4:51:34 PM
Metadata
Fields
Template:
BOCC
Date
12/7/2009
Meeting Type
Regular Meeting
Document Type
Contract
Document Relationships
Agenda - 12-07-2009 - 4i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 12-07-2009
R Purchasing - McQueen Construction Fairview Park
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2009
RES-2009-084 Resolution Authorizing the County Manager to Execute a Contract and Any Change Orders for the Twin Creeks Greenway Project U-4726 GA
(Linked To)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ r ~a-d7-o 9 <br />y <br />This Contract is between Orange County and ~(t(~~C;~ ~,Z,~,~ ("Contractor"), dated <br />~2-17-C.~3 for construction services related to the Twin Creeks District Park-Greenway. By signing this <br />document Contractor agrees to be bound by all of the terms and specifications of the Contract Documents as <br />defined in bold print below. <br />IN ITNESS WI~REOF, a Parties hereto have caused this C r be exec din tl3eir respective names. <br />~-~, <br />Cont cto Valerie Foushee, Chair-Orange County <br />Board of Commissioners <br />YC .~ z~ <br />Printed me and Title Attest- ~- Da a ~~~~~~ <br />~~ ~~F <br />~ ~~~~ <br />~~; .t ~ ' <br />~~~~ ; `~ <br />i' <br />S ~ ~} <br />~' <br />~~r~4 ~ti~'`~ry~v <br />_~. <br />I have reviewed the attached Contract Documents and understand that the State of North Caroliria~requires this <br />Contract conform to its contracting and specifications requirements and that as such a traditional contract may <br />not be utilized. Therefore, solely as to the attached Contract Documents consisting of the bid solicitation, <br />proposal, Project Manual dated October 22, 2009, drawings dated October 22, 2009, including sheets TC- <br />0.0, TC-1.1, TC-2.1, TC-2.2, TC-2.3, TC-2.4, TC-3.1, TC-3.2, TC-3.3, TC-4.1, TC-4.2, TC-8.1, TC-8.2, TC- <br />8.3, and TC-8.4, NCDOT Standard Specifications for Roads and Structures (July 2006 edition), non- <br />collusion affidavit, debarment certification, and attached Notice To Proceed. The Contract Documents are <br />approved as to form and legal sufficiency. <br />/o, <br />my Attorney <br />This instrument has been pre-audited in the manner required by the Local Government Budget and Fiscal <br />Control Act. <br />Finance Director <br />roved as to Technical Content <br />~~ ~ <br />Depar nt D' ctor <br />Section to be completed by the North Carolina Department of Transportation <br />This bid has been reviewed in accordance with Article 103-1 of the Standard Specifications for Roads and <br />Structures dated July 1, 2006. <br />Reviewed by: <br />Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.