Browse
Search
RES-2009-041 Congestion Mitigation & Air Quality (CMAQ) Resolution with N C Dept of Transportation
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2009
>
RES-2009-041 Congestion Mitigation & Air Quality (CMAQ) Resolution with N C Dept of Transportation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 9:28:34 AM
Creation date
12/14/2009 4:41:35 PM
Metadata
Fields
Template:
BOCC
Date
5/19/2009
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
4Q
Document Relationships
Agenda - 05-19-2009 - 4q
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 05-19-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ The County shall be responsible for designing an erosion control plan if required by the <br />North Carolina Sedimentation Pollution Control Act of 1973, North Carolina General <br />Statute 113A, Article 4, incorporated in this Agreement by reference at <br />www.ncleg.net/gascrints/Statutes/Statutes.asp, and obtaining those permits required <br />thereby in order to construct the Project. During the construction of the improvements, <br />the County, and its contractors and agents, shall be solely responsible for compliance <br />with the provisions of said Act and the plan adopted in compliance therewith. <br />10. RIGHT OF WAY /UTILITY AUTHORIZATION <br />If the costs of right of way acquisition or utility relocation are an eligible expense, the County shall <br />submit a letter of request to the Department to authorize and setup right of way and/or utility <br />funding. The acquisition for right of way, construction easements, and/or utility relocation may be <br />undertaken only after the County receives written authorization from the Department to proceed. <br />11.PROJECT LIMITS AND RIGHT OF WAY (ROW) <br />SPONSOR PROVIDE ROW <br />The County, at no liability whatsoever to the Department, shall be responsible for providing and/or <br />acquiring any required right of way and/or easements for the Project. <br />TIME FRAME FOR ROW ACTIVITY <br />The County will accomplish all ROW activities, to include certification of ROW, within 6 months of <br />execution of this Agreement. <br />RIGHT OF WAY GUIDANCE <br />The County shall accomplish all right of way (ROW) activities, including acquisition and <br />relocation, in accordance with the following: Federal Aid Policy Guide, Title 23 of the Code of <br />Federal Regulations, Part 710, Subpart B, and Title 49 of the Code of Federal Regulations, Part <br />24, [Uniform Act] incorporated by reference at www.fhwa.dot.gov/legsregs/directives/fapgtoc.htm; <br />North Carolina General Statutes, Chapter 133, Article 2, Sections 133-5 through 133-18, <br />Relocation Assistance, incorporated by reference at <br />Agreement ID # 149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.