Browse
Search
RES-2009-041 Congestion Mitigation & Air Quality (CMAQ) Resolution with N C Dept of Transportation
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2009
>
RES-2009-041 Congestion Mitigation & Air Quality (CMAQ) Resolution with N C Dept of Transportation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 9:28:34 AM
Creation date
12/14/2009 4:41:35 PM
Metadata
Fields
Template:
BOCC
Date
5/19/2009
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
4Q
Document Relationships
Agenda - 05-19-2009 - 4q
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 05-19-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. PLANNING AND DESIGN <br />CONTENT OF PLAN PACKAGE <br />The County, and/or its agent, shall prepare the Project's plans, specifications, and a professional <br />estimate of costs (PS&E package), in accordance with the Department's guidelines and <br />procedures, and applicable Federal and State standards. All work shall be submitted to the <br />Department for review and approval. The plans shall be completed to show the design, site <br />plans, landscaping, drainage, easements, and utility conflicts. <br />TIME FRAME FOR SUBMITTAL <br />The preliminary PS&E package is due to the Department within six (6) months of execution of this <br />Agreement. The final PS&E package is due within eight (8) months of execution of this <br />Agreement. <br />9. ENVIRONMENTAL DOCUMENTATION <br />The County shall prepare the environmental and/or planning document, including any <br />environmental permits, needed to construct the Project, in accordance with the National <br />Environmental Policy Act (NEPA) and all other appropriate environmental laws and regulations. <br />All work shall be performed in accordance with Departmental procedures and guidelines. Said <br />documentation shall be submitted to the Department for review and approval. <br />^ The County shall be responsible for preparing and filing with all proper agencies the <br />appropriate planning documents, including notices and applications required to apply for <br />those permits necessary for the construction of the desired improvements. Copies of <br />approved permits should be forwarded to the Department. <br />^ The County shall advertise and conduct any required public hearings. <br />^ If any permit issued requires that action be taken to mitigate impacts associated with the <br />improvements, the County shall design and implement a mitigation plan. The County <br />shall bear all costs associated with said mitigation plan, including penalties for violations <br />and claims due to delays. <br />Agreement ID # 149 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.