Browse
Search
RES-2009-041 Congestion Mitigation & Air Quality (CMAQ) Resolution with N C Dept of Transportation
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2009
>
RES-2009-041 Congestion Mitigation & Air Quality (CMAQ) Resolution with N C Dept of Transportation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 9:28:34 AM
Creation date
12/14/2009 4:41:35 PM
Metadata
Fields
Template:
BOCC
Date
5/19/2009
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
4Q
Document Relationships
Agenda - 05-19-2009 - 4q
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 05-19-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. PROFESSIONAL AND ENGINEERING SERVICES <br />PROCUREMENT POLICY <br />When procuring professional services, the County must adhere to Title 49 Code of Federal <br />Regulations, Part 18.36, Title 23 of the Code of Federal Regulations, Part 172, Title 40 United <br />States Code, Chapter 11, Section 1101-1104, North Carolina General Statute 143-64, Parts 31 <br />and 32 and the Department's Policies and Procedures for Major Professional or Specialized <br />Services Contracts. Said policies and standards are incorporated in this Agreement by reference <br />at www.fhwa.dot.gov/legsr~gs/legislat.html and www.ncleg.net/gascripts/Statutes/Statutes.asp. <br />^ The County shall ensure that a qualified firm is obtained through an equitable selection <br />process, and that prescribed work is properly accomplished in a timely manner and at a <br />just and reasonable cost. <br />^ If the Department is participating in the costs of professional services and the proposed <br />contract exceeds $30,000, apre-negotiation audit must be requested from the <br />Department's External Audit Branch. <br />^ Reimbursement of construction administration costs cannot exceed fifteen percent (15%) <br />of the total construction contract. <br />SMALL PROFESSIONAL AND ENGINEERING SERVICES FIRMS REQUIREMENTS <br />Any contract entered into with another parry to pertorm work associated with the requirements of <br />this agreement shall contain appropriate provisions regarding the utilization of Small Professional <br />Services Firms (SPSF). This policy conforms with the SPSF Guidelines as approved by the NC <br />Board of Transportation. These provisions are incorporated into this Agreement by reference <br />www ncdot ora/doh/preconstruct/ps/contracts/sp/2006sp/municipal html <br />^ The County shall not advertise nor enter into a contract for services pertormed as part of <br />this Agreement, unless the Department provides written approval of the advertisement or <br />the contents of the contract. <br />^ If the County fails to comply with these requirements, the Department will withhold <br />funding until these requirements are met. <br />Agreement ID # 149 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.