Browse
Search
RES-2009-041 Congestion Mitigation & Air Quality (CMAQ) Resolution with N C Dept of Transportation
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2009
>
RES-2009-041 Congestion Mitigation & Air Quality (CMAQ) Resolution with N C Dept of Transportation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 9:28:34 AM
Creation date
12/14/2009 4:41:35 PM
Metadata
Fields
Template:
BOCC
Date
5/19/2009
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
4Q
Document Relationships
Agenda - 05-19-2009 - 4q
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 05-19-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. If the County does not submit all required pre-construction documentation by August 29, <br />2009, then the Department will reimburse the percentages of project costs as shown in <br />the funding table up to a maximum of $146,900. The County shall provide a local match, <br />as detailed in the table below, and all costs that exceed the total estimated cost. <br />CAPITAL IMPROVEMENTS - FY 2009 <br />C-4932 A - DCHC <br />.........._.,.__........._ ..........................................................____............................................7 ......._......._......._....._........:..._.............._...._...._............_............._.................................._. <br />Fund Source Total Estimated Cost ;Federal Funds Amount Non-Federal Match <br />(100%) i (80%) (20%) <br />CMAQ ~ $5,797 i $4,540 $1,257 <br />C-4932 B - TARPO <br />Fund Source Total Estimated Cost ;Federal Funds Amount Non-Federal Match <br />(100%) (80%) (20%) <br />.._.~_......_...._....,.._....__._... _..__ __ ._...._._....~._______`_..........._._.E _ <br />...._._W_______-,~_,_~___..____.~_._.__._..~ .................v____...._.._........ _....... ___ <br />CMAQ $14,478 $11,680 $2,798 <br />OPERATING RSSISTANGE - I"Y 2009 <br />For Federal Fiscal Years 2010 and 2011 and subject to compliance by the County with the <br />provisions set forth in this Agreement and the availability of federal funds, the Department shall <br />participate up to a maximum amount of TWO HUNDRED SIXTY ONE THOUSAND THREE <br />HUNDRED SIXTY DOLLARS ($261,360), as detailed below. The County shall provide a local <br />match, as detailed in the Funding Table below, and all costs that exceed the total estimated cost. <br />OPERATING ASSISTANCE - FY 2010 <br />C-4932 B - TARPO <br /> Federal Funds 'Reimbursement ~ Non-Federal ( Non-Federal _. <br /> Amount Rate ~ <br />~ Amount Match Rate <br />.,,.,.,.,v__ ~~ <br /> <br />FY 2010 ~ ._.. ~_ _ ..._~. <br />_. ~._ __.._..~._ .._ _ _ _ _..r W__ _. <br />$130,680 66% ! <br /> <br />$67,320 ~ <br /> <br />34% <br />Agreement ID # 149 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.