Browse
Search
RES-2009-041 Congestion Mitigation & Air Quality (CMAQ) Resolution with N C Dept of Transportation
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2009
>
RES-2009-041 Congestion Mitigation & Air Quality (CMAQ) Resolution with N C Dept of Transportation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 9:28:34 AM
Creation date
12/14/2009 4:41:35 PM
Metadata
Fields
Template:
BOCC
Date
5/19/2009
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
4Q
Document Relationships
Agenda - 05-19-2009 - 4q
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 05-19-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIGNAGE <br />The County shall provide and maintain adequate signage and other warning devices for the <br />protection of the public in accordance with the approved traffic control plans for the Project and <br />the current edition of the Manual on Uniform Traffic Control Devices (MUTCD) for Streets and <br />Highways, or any subsequent revision of the same, published by the Federal Highway <br />Administration and effective at the time of award of the contract. <br />SITE LAYOUT <br />The County shall be responsible for ensuring that all site layout, construction work, and Project <br />documentation are in compliance with applicable city, state and federal permits, guidelines, and <br />regulations, including American Association of State Highway and Transportation Officials <br />(AASHTO) guidelines and American with Disabilities Act (ADA) Standards for Accessible Design <br />(www. usdojyov/crt/ada/stdsg_df. htm ). <br />CONSTRUCTION ENGINEEERING, SAMPLING, TESTING <br />The County, and/or its agent, shall perform the construction engineering, sampling and testing <br />required during construction of the Project, in accordance with Departmental procedures, <br />including the Department's Guide for Process Control and Acceptance Sampling and Testing. <br />The County shall document that said compliance was accomplished in accordance with State and <br />Federal procedures, guidelines, standards and specifications. <br />RIGHT TO INSPECT <br />The Department and representatives of the Federal Highway Administration shall have the right to <br />inspect, sample or test, and approve or reject, any portion of the work being performed by the <br />County or the County's contractor to ensure compliance with the provisions of this Agreement. <br />Prior to any payment by the Department, any deficiencies inconsistent with approved plans and <br />specifications found during an inspection must be corrected <br />CONTRACTOR COMPLIANCE <br />The County will be responsible for ensuring that the contractor complies with all of the terms of <br />the contract and any instructions issued by the Department or FHWA as a result of any review or <br />inspection made by said representatives. <br />Agreement ID # 149 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.