Orange County NC Website
<br /> <br />~® R® E A U X <br />•- Construction Company. Inc <br />BCC Direct Labor Cost: $`,2.3,469.00 <br />BCCDirect Material C©st: $.II,S99.00 <br />BCCDirectSubeontractor Cos~~ $19I,7S1.00 <br />BCC Direct Unit Price Cost: $24,650: DO <br />Buililets Risl~ $4,71,5.00 - ~ • <br />~'hange -Order Band: $2, 91I.OD ~ • <br />Taxes &-Irrsurar:ce on Labor: $8,214 0.0 <br />Sates Tax: $898.00 <br />BCC CO Olt&P (Prime@ IS~6): $6,627 00 <br />BCC CO OH&P (Subcontractors @ 10%): $19,175.00 <br />Total Cost: $294,009.00 <br />Please see the attached proposal breakdown and pricing from Bordeaux Construction <br />Company. Xfproposnl is approved and r~ecrrted by December 16`h, 2009, the rxew <br />~Tinal" Completion date for the above referenced project will be April2.3'd , 2010 <br />*Upon acceptance of tlxis proposal by the owner and execution of art change order <br />by the owner; Bordear~c Construction reserves' the right to review the schedule <br />impad for code improvement revlsiorzs, the schedule impact of asbestos abatement <br />revision arsd delays as associated with extended overhead cos#,per revisions <br />regxxested by Orange Cou-xty Building Lzspections Departmen> <br />Sincerely, - ~ . <br />$ordeaug C ns - "o Coffipatxy, Jf>QC. <br />Chad Lloyd <br />Project Manager ~ ~ - <br />PO Bog 2935, Durham, NC 27715-2935 100 E Bxitania Ave ,Durham, NC 27744 <br />(919) 220-1 ill. tel ~ (9i9) 220-1147 fax <br />ti~~sacv.bordcauxoustructionco.com <br />