Orange County NC Website
<br /> <br />- l~ ~ Fa ~ ~ A U X <br />.Constructeon Company inc. <br />Staii'~~-1 . <br />"Sclaeduie Impircfirrg Scope": Demo, Fire Kating of Walls, New D!F/I~. <br />s Labor: $740.,00 - <br />- + ~ Material: $644.00 ~ ~ - . <br />® Subcontractoa•: N/A <br />® -Unit Prices (Df1=/II): $2,500.00 <br />`4Yoh~Schedule Impacliiag Scope: New Base & Casing (N/A} <br />Mural Corrr~roorrt <br />"Schedule Impacting Scope": Scaffolding and Cleaning <br />® Laboz: $720:00 - <br />Mateziai: $2$8.00 <br />~ Subcontractoz: $10,262.00 <br />Stair~S 2 <br />"Schedule Impacting Scope": Demo, Remove D&F, New framing and patching, Fire <br />Rating of Walls, Ne~.v D/F/H. ~ ~ - <br />~ Labor. $1,9A5,04 <br />o IvFaterial: $960.00 <br />a Subcontractor: N/A <br />® ullit Prices (D/F/H}: $2,50o.0a <br />"Non-yS'cfiedule Impacting Scope: New Casing <br />® Subcontractor: $1,040.00 <br />StairX,~-1 <br />"Schedule Xmpacting Scope": Ne~v framing and patching,. Fire Rating of Wa11s, New <br />D/F/H. ~ . <br />~ Labor: $1,550.00 ' <br />a Material: $375.00 <br />A Subco~.ctor: N/A <br />® Unit Prices (D/F/I~): $2,SOOAO <br />won-~Sehedatye I,napacting Scope: New Casizlg <br />a Subcontractor: $500.00 <br />PO Box 2935, Durham, NC 27715-2935 100 ?~_ Btitania Ave., Diu-ham, tvrC 27704 <br />(919} 22(3-1141 tel (914} 220-1147 fa.4 <br />' t~tv~~bonleaueconstructionw.~rom <br />