Orange County NC Website
5.1 Kick -off Meeting. A project kick -off meeting will be conducted by FITS and Client at a time and place to be <br />mutually agreed upon by the parties. <br />5.2 Commencement Date. Development will commence following the execution by Client and FITS of the <br />Solution Design Document. <br />5.3 Estimated Design Completion Date. The estimated date of completion will be set forth in the Solution <br />Design Document. Any changes to the scope of Services or the Solution Design may affect the estimated <br />date of completion. Any revision to the date of completion will be set forth in the Change Request Form. <br />Solution Design Document —to be mutually developed <br />Attachment A - Change Request Form <br />Attachment B - Project Acceptance Form <br />n � 7 £�y,.- c • ;,°� sir,... ..�..• <br />The Services to be performed and the fees described In this Statement of Work are based upon the following <br />assumptions: <br />• CCE Desktop will not integrate to any Client provided applications (e.g. CRM systems, etc.) <br />• All workstations are running Windows XP <br />• Client will provide link to initiate chat session on Client's external web site. Client will either provide IIS <br />server to host Chat Gateway or provide external route to CCE server for external chat. <br />• Client Email server supports POP3 and SMTP connection from Contact Center Express Email Media <br />Store <br />• Implementation work at the Client's location will occur during the normal work week (M — F excluding <br />holidays) and will allow for travel by RTS personnel during the work week. <br />• Avaya AE Services will be configured with the required licensing to accommodate the CCE <br />implementation. This Statement of Work does not include AES configuration. <br />• Client is responsible for securing PBX (Communication Manager) programming required by the CCE <br />implementation. RTS can provide this service under a separate Statement of Work. <br />• Client will acquire all servers required by the solution (from RTS or another source) <br />System Requirements: <br />This RTS Professional Services Statement of Work covers implementation of Avaya Contact Center Express. It is <br />the Client's responsibility to acquire all necessary components required by the Contact Center Express <br />Implementation. RTS will provide supply quotes for these necessary components as part of a separate Statement <br />of Work. Following are the System Requirements for Contact Center Express: <br />Desktop <br />Hardware: 1.6 GHz Pentium, 512MB of RAM, 50MB of free hard disk space, DVD drive, graphics card <br />capable of supporting 1024768 resolution monitor, mouse or other Windows - compatible pointing device, <br />and TCP /IP LAN connection. <br />Software: Either Windows Vista (Enterprise), Windows XP Professional 32 -bit SP21SP3, Application <br />Enablement Services (AE Services) client software, Microsoft Internet Explorer 6.0 SP1 and Microsoft Net <br />Framework 2.0 or 2.0 SP1. VMWare VDI is supported with CCE Desktop. <br />Server (min 2 required) <br />A minimum of two servers are required for this implementation: the core server and the data server. The <br />core server hosts processes such as the license manager, XML server (for event handling), and <br />Statement of Work No. ORD- 23171- EA2E50 6/23/09 -W -1.0 <br />Relational Technology Solutions "RTS'— Proprietary <br />5 <br />