Orange County NC Website
"Your IP Communications - Convergence Partner" <br />Relational <br />Teelmology Solutions <br />Phase T- Cain- RTS will install a G430 gateway and 1 UPS. RTS will Install 34 IP End Points and 4 analog <br />at this location. Orange County will Install the remaining 0 IP Endpoints. <br />Phase 8- COSC.• RTS will install a G430 gateway and 1 UPS. RTS will Install 0 IF End Points and 3 analog <br />at this location. Orange County will Install the remaining 7 IP Endpoints, <br />Phase 9- Sawyer• RTS will install a G430 gateway and 1 UPS. RTS will install 11 IP End Points and 1 <br />analog at this location. Orange County will install the remaining 0 IP Endpoints. <br />Phase 10- OPTPW.• RTS will Install a G430 gateway and 1 UPS. RTS will install 22 IP End Points and 5 <br />analog at this location. Orange County will install the remaining 0 IF Endpoints. <br />Phase 11- CSAAWAX Location will be connected via Copper through another existing gateway. RTS will <br />Install 0 IP End Points and 11 analog at this location. Orange County will install the remaining 0 IP Endpoints. <br />Phase 12- Gaegay RTS will Install a G430 gateway and 1 UPS. RTS will install 63 IP End Points and 6 <br />analog at this location. Orange County will install the remaining 0 IP Endpoints, <br />Phase 13 -.W..- RTS will install a G430 gateway and 1 UPS. RTS will Install 0 IP End Points and 2 analog at <br />this location. Orange County will Install the remaining 6 IP Endpoints. <br />Phase 14- JWdLe: RTS will install a G430 gateway and 1 UPS. RTS will install 0 IP End Points and 3 <br />analog at this location. Orange County will install the remaining 39 IP Endpoints. <br />Adjunct Equipment and Offer Services <br />RTS will provide Project Management of all services described above and will provide coordination between <br />RTS, ORANGE COUNTY. <br />RTS will provide end -user training on the ACM voice system telephones and CMM voice mail. RTS will not <br />provide configuration or training on Call Center adjunct systems (CCE) within this SOW. <br />Statement of Network Perfrnmance Responsictlity. <br />In as much as RTS will be Installing and configuring new LAN "edge" equipment that will directly connect all <br />components of the Avaya Aura voice system, RTS will take responsibility for proper configuration, testing, and <br />documentation to Insure acceptable performance and coverage under Avaya Global Services Maintenance. <br />For these requirements, reference the Avaya LAN Administration Guide ( htW :flpreview.tinyuri.com/nt993g). <br />-20- <br />This document Is proprietary and confidential to Relational Technology Solutions. <br />Unauthorized distribution is prohibited. <br />