Browse
Search
2009-027 Purchasing - Relational Technology Solutions Proposal and SOW for Orange Co-
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-027 Purchasing - Relational Technology Solutions Proposal and SOW for Orange Co-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2012 12:38:37 PM
Creation date
12/10/2009 3:10:55 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2009
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
4cc
Document Relationships
Agenda - 06-02-2009 - 4cc
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 06-02-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`lour iP Communications - Convergence Partner" <br />Rely "Mm <br />Technology Solutions <br />CMM Voice Map <br />ORANGE COUNTY's voice mail will be replaced by an Avaya Communication Manager Messaging (CMM). <br />RTS will provide integration with the upgraded Communication Manager platform. RTS will install a new user <br />mailbox account as required. RTS will also configure any automated attendants to be needed by the <br />COUNTY departments. RTS will provide administration training to COUNTY staff members as a part of this <br />implementation. <br />Site -by -Site retails (Voice Implementation) <br />Phase 1A - PUmNisig.• RTS will Install a G430 gateway and 1 UPS. This gateway will be the single point of <br />Integration with the COUNTY'S existing Norte( Option 61 C. The integration will be configured as two (2) PRI <br />"tie- lines" designed to cant' inter- system traffic as needed during the phased voice transition. <br />Phase 1B- OffbeBkuliffirg.• RTS will install a S851 0/G450 CM 5.X with 716 Station RTU. One (1) AES Server <br />for integration to two (2) Contact Center Express Servers. One UPS back -up system will also be installed at <br />this location to support all listed Hardware. RTS will implement Communication Manager Messaging (CMM) <br />on the S8510 server at this site to serve all voice mail needs throughout the County. This location will serve <br />as the future core of the enterprise. 2 PRI Trunks will be run out of this location once the Nortel at the <br />purchasing location has been terminated. RTS will Install 5 IP End Points and 9 analog at this location. <br />Orange County will install the remaining 80 IP Endpoints. <br />Phass2 -LAV .• RTS will Install a G430 gateway and 1 UPS. RTS will Install 0 IP End Points and 3 analog <br />at this location. Orange County will install the remaining 14 IP Endpoints. <br />Phase 3 —H kkrogg/i Commons: RTS will Install a S8510 LSP / G450 gateway and 1 UPS. RTS will install <br />0 IP End Points and 17 analog at this location. Orange County will install the remaining 200 IP Endpoints. <br />One (1) T1 will also be installed at this location. <br />Phase 4— Lk* Center RTS will install a G430 gateway and 1 UPS. RTS will install 40 IP End Points and 4 <br />analog at this location. Orange County will install the remaining 0 IP Endpoints. <br />Phase r E/e� RTS will install a G430 gateway and 1 UPS. RTS will install 0 iP End' Points and 5 <br />analog at this location. Orange County will Install the remaining 8 IP Endpoints. <br />Phase B- W ftd• RTS will install a S8300LSP /G450 gateway and 1 UPS. RTS will install 93 IP End Points <br />and 1 i analog at this location. Orange County will install the remaining 0 IP Endpoints. <br />-19- <br />This document Is proprietary and confidential to Relational Technology Solutions. <br />Unauthorized distribution is prohibited. <br />
The URL can be used to link to this page
Your browser does not support the video tag.