Browse
Search
2009-027 Purchasing - Relational Technology Solutions Proposal and SOW for Orange Co-
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2009
>
2009-027 Purchasing - Relational Technology Solutions Proposal and SOW for Orange Co-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2012 12:38:37 PM
Creation date
12/10/2009 3:10:55 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2009
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
4cc
Document Relationships
Agenda - 06-02-2009 - 4cc
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 06-02-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"Your IP Communications - Convergence Partner" <br />Retalloonal <br />Technology Solutions <br />Specific to this Scope of Work, the following actions will occur as part of the cutover process; <br />• Cutover will occur at a time mutually agreed upon time by the Customer and RTS. <br />• Disruptive cutover activities will be performed after hours. <br />• RTS will assure health of all hardware and services involved In the Scope of Work before commencing <br />work, identifying and recording all alarms and errors. If any alarms and/or errors exist, a "go / no go" <br />termination will be made. <br />• Non - disruptive tasks shall be performed during business hours, unless specifically stated otherwise in <br />this document. <br />• On Site Technician connects ports to distribution system. <br />• On Site Technician connects ports to Local Exchange Carrier (LEC) and the Inter- Exchange (IXC) <br />Trunks <br />• On Site Technician places & initializes Phones <br />On Site Technician makes test calls, €ntra- system, inter - system, and to the Public Switched Telephone <br />Network (PSTN) <br />■ Test "9, 911" and "911" <br />■ Status the health of the system and resolve or account for any errors or alarms that exist on the system, <br />to the satisfaction of the Customer. <br />• Installation is considered complete. <br />5.5.2 First Day of Business <br />RTS will: <br />• Provide an on -site Technician to resolve any physical problems resulting from this project. Activities are <br />performed during business hours, Monday through Friday; excluding designated holidays. The staffing <br />period for this resource is 8 hours. <br />• Perform Final Registration with Avaya <br />5.6 Solution Assurance <br />After installation Is complete, the Installed system will be tested with the Customer present. If the system is <br />installed in good working order, In accordance with the applicable documentation, the system will be deemed <br />In- Service, and the Customer will sign RTS' Acceptance Document. After the In- Service date, service work is <br />warranted for a period of 30 calendar days. <br />6 RTS and Customer - Obligations and Cures <br />6.1 RTS <br />RTS warrants that the Services will materially conform to the specifications set forth In this SOW upon <br />completion thereof. If RTS fails to provide the Services as warranted and Customer notifies RTS of such non- <br />-12- <br />This document is proprietary and confidential to Relational Technology Solutions. <br />Unauthorized distribution Is prohibited. <br />
The URL can be used to link to this page
Your browser does not support the video tag.