Browse
Search
Agenda - 12-07-2009 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 12-07-2009
>
Agenda - 12-07-2009 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 2:44:46 PM
Creation date
12/4/2009 2:51:01 PM
Metadata
Fields
Template:
BOCC
Date
12/7/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20091207
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Environmental Assessment and ATTACHMENT C <br />Environmental Impact Statement Requirements <br />Environmental Assessment (Orange <br />County Application Requirements) <br />Environmental Assessment (State <br />Application Requirements) <br />Orange County Enhanced <br />Environmental Impact Statement (Orange <br />County Requirements) <br />(Site Plan Per Article 14) <br />Impetus for Study: <br />Impetus for Study: <br />Impetus for Study: <br />Required if any of the following apply to <br />Required if a transfer station is proposed to <br />Required if any one of the Environmental Impact <br />the site: <br />handle 350 tons, ormore, of waste per day. <br />Statement (EIS) trigger criteria (e.g. mining, <br />This project is proposed to handle 250 tons <br />hazardous materials, state or federal EIS required) <br />1. It is a small or large generator of <br />per day so neither a SEPA Environmental <br />are present and/or if planning staff determines that <br />hazardous waste. <br />Assessment nor a SEPA Environmental <br />the applicant has not adequately addressed <br />2. Uses in a commercial or industrial <br />Impact Statement is required. The applicant <br />significant issues in the EA that are required to be <br />operation more than 10,000 gallons of <br />followed the State format in order to provide <br />addressed per the Orange County Environmental <br />water /day. <br />adequate information on the project that <br />Impact Ordinance. <br />3. Require grading of more than 40,000 <br />would allow Orange County staff to perform a <br />square feet, exclusive of roads, for <br />more detailed EA analysis. <br />non - residential... development. (This <br />is the triggering item for EA review) <br />Potential new information could activate the <br />4. Require grading of more than 40,000 <br />need for additional information to be <br />square feet, exclusive of roads, for non- <br />submitted for either the EA Enhanced or the <br />residential components of residential <br />EIS. <br />development. <br />5. Any stat permit as listed below and/or: <br />a. State or Federal requirement to file <br />an SEPA or NEPA document. <br />b. Property located in a state- <br />classified water supply <br />watershed <br />c. Slopes in excess of 25% outside of <br />easement or stream buffers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.