Browse
Search
Agenda - 12-07-2009 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 12-07-2009
>
Agenda - 12-07-2009 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 2:44:46 PM
Creation date
12/4/2009 2:51:01 PM
Metadata
Fields
Template:
BOCC
Date
12/7/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20091207
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITIZENS INVOLVEMENT PHASE <br />CONSULTANT <br />SELECTION F -�� <br />SITE PLANNING PHASE DESIGN & PERMITTING PHASE <br />ORANGE CITIZENS APPROVAL <br />COUNTY OWASA ADVISORY <br />L- STORMWATER EROSION <br />MANAGEMENT CONTROL PLAN <br />PLAN <br />AUTHORIZATION BOCCE PEER <br />SITE TO NEGOTIATE SITE CONCEPT FINAL SITE REVIEW <br />SELECTION PURCHASE OF PLAN APPROVAL PLAN <br />SITE ---- <br />? FINAL DESIGN FLOW <br />CPD PRELIMINARY DETAILED CSWD <br />DESIGN DESIGN AUTHORIZATION CHART <br />APPROVAL DEVELOPMENT CONSTRUCTION CONTINUED <br />PACKAGE DOCUMENTS BELOW <br />ESTABLISH PEER GREEN 4� <br />CITIZENS ADVISORY -- REVIEW BUILDING OWASA <br />COMMITTEE PROGRAM DENR <br />OWASA DENR SW NCDOT NCDOT <br />WATER /SEWER PERMIT PERMIT APPROVAL <br />PERMIT APPLICATION APPLICATION <br />PEER APPLICATION <br />FLOW CHART <br />REVIEW <br />CONTINUED <br />FROM ABOVE <br />W <br />BIDDING & FUNDING PHASE <br />FINAL DESIGN <br />& <br />CS WD <br />AUTHORIZE <br />CONSTRUCTION <br />AUTHORIZATION <br />BIDDING CONSTRUCTION <br />DOCUMENTS <br />CONTRACT <br />AWARD <br />PEER <br />REVIEW <br />AUTHORIZE <br />SITE <br />ACQUISITION <br />BDCC <br />CONSTRUCTION <br />PROJECT <br />AUTHORIZ <br />COST <br />FUNDING <br />APPROVAL DISPOSAL <br />ESTIMATE <br />CONTRACT <br />AWARD <br />AUTHORIZE <br />HAUL <br />CONTRACT <br />AWARD <br />FINANCE K PURCHASE <br />AGREEMENT <br />FOOT NOTES <br />j AUTHORIZATION TO SUBMIT <br />J ADMINISTRATIVE APPROVAL <br />$I J POSSIBLE PERMIT APPROVAL REQUIRED <br />J J BASED UPON REQUIRED PERMITS <br />CONSTRUCTION PHASE <br />CPDJ DENR) <br />TS OTHER OMMERCIAL <br />CONSTRUCTION APPROVAL STARTUP COPERATION <br />HAUL <br />CONTRACT <br />PROPOSAL <br />EHAUL AND <br />OSAL DI SPOSAL P <br />CONTRACT <br />PROPOSAL <br />CERTIFICATE <br />TO <br />OPERATE <br />LEGEND <br />APPROVAL COUNTY AND /OR REGULATORY APPROVAL <br />PROJECT ACTIVITY <br />ABBREVIATIONS <br />CSWD COUNTY SOLID WASTE DEPARTMENT <br />DENR DEPARTMENT OF ENVIRONMENT AND <br />NATURAL RESOURCES <br />CPD COUNTY PLANNING DEPARTMENT <br />OWASA ORANGE WATER L SEWER AUTHORITY <br />NCDOT NC DEPARTMENT OF TRANSPORTATION <br />BOCC BOARD OF COUNTY COMMISSIONERS <br />ORANGE COUNTY <br />TRANSFER STATION IMPLEMENTATION <br />FLOW SCHEMATIC <br />OCT. 30, 2009 <br />C <br />
The URL can be used to link to this page
Your browser does not support the video tag.