Browse
Search
Agenda - 12-07-2009 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 12-07-2009
>
Agenda - 12-07-2009 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 2:44:46 PM
Creation date
12/4/2009 2:51:01 PM
Metadata
Fields
Template:
BOCC
Date
12/7/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20091207
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Will the project involve a lanes application system far. <br />treatment of wastewater? No <br />If yes, describe <br />Has an application for a non-discharge permit been <br />submitted to the NC Department of Environmental <br />Manage-meat or Orange County Department of Environmental <br />Health? <br />d, is a septic tank system proposed which has a design <br />capacity of more than 3000 gallons per day? _ No <br />If yes, describe <br />Has an application for a non-discharge permit been <br />submitted to the NC Department of Environmental <br />Management or grange County Department of Environmental. <br />Health? <br />S. Does the activity involve sludge disposal? No <br />If yes, where is the source of the sludge? <br />Describe where and how the sludge is being disposed. <br />6. Water Usage <br />a. Estimated no. of employees ZA_ x 25 god X400 qm <br />b. Estimated water use for climate control gs d <br />C. Process grater <br />500 -1000 go <br />_S(. % consumed <br />discharged to septic system <br />t discharged to surface (including stores sewers) <br />(describe. <br />evaporated <br />.f % reclaimed/reused Consumptive volume of water to be <br />% other evaluated during design stage <br />100 % <br />
The URL can be used to link to this page
Your browser does not support the video tag.