Browse
Search
Agenda - 12-07-2009 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 12-07-2009
>
Agenda - 12-07-2009 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2009 10:00:06 AM
Creation date
12/4/2009 2:25:53 PM
Metadata
Fields
Template:
BOCC
Date
12/7/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes - 20091207
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
ORD-2009-139 -An Ordinance Amending the Orange County Zoning Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2009
ORD-2009-139 Zoning Ordinance Text Amendment Relating to Outdoor Lighting
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />ATTACHIVIENT ONE (1) <br />detail shall also show the vertical angle of illumination for all <br />proposed fixtures that will be used to determine the <br />required shielding angle,; <br />D. Alighting plan shall delineate the horizontal position of all <br />lighting fixtures proposed for a parcel of property. <br />G:E. Photometric data, such as that furnished by the <br />manufacturer, showing the angle of light emission and <br />lumen output. An example of a photometric plan is as <br />follows: <br />Proposed litht <br />location <br />c1 <br />-_. <br />~.__ <br />1 X3.3 2_Q:~~ L~O.C~• <br />+ + Light Intensity <br />Levels <br />21 .7 24.1 1 8.~ 2 ~ <br />+ + + "i' <br />20.9 25.1 22. C 25.1 1 9.5 <br />+ + + -E- + <br />~~71~~ 1~~~~.~1~7 ~1 <br />In this example, the proposed light pole generates the <br />specific lumen levels on the property. Staff will be <br />responsible for utilizing this data to verify the compliance of <br />the fixture within the provisions of the Ordinance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.