Orange County NC Website
Additional Construction Administration Fee: <br />(Full Time NCDOT Concrete Certified Site Inspector) <br />$ 81,400.00 <br />Geotechnical Testin $ 26,000.00* <br />Landscaping and Site Amenities: <br />(Signage, Benches, Doggie Waste Stations and Trash/ <br />Rec clin Rece tacles <br />$ 65,000.00* <br />Construction Contin enc (15% $ 74,848.86 <br /> <br />Total $746,241.26 <br />* Estimated <br />