Browse
Search
Agenda - 12-07-2009 - 4i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 12-07-2009
>
Agenda - 12-07-2009 - 4i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2009 9:22:55 AM
Creation date
12/4/2009 12:49:30 PM
Metadata
Fields
Template:
BOCC
Date
12/7/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4i
Document Relationships
2009-104 AMPS - McQueen Construction, Inc. for Twin Creeks Park-Greenway Construction, Phase 1
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Minutes - 20091207
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
RES-2009-084 Resolution Authorizing the County Manager to Execute a Contract and Any Change Orders for the Twin Creeks Greenway Project U-4726 GA
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A ~.~~ ~ <br />Twin Creeks (Moniese Nomp) Greenway Budget <br />Revenues /Funding Sources: <br />Source Amount <br />2001 Parks and Open Space Bond $1,673,221 <br />- minus remaining Soccer Superfund portion (for <br />soccer use elsewhere - $625,000 <br />- minus buildin stabilization funds (2008) - $150,000 <br />+ ARRA Trans ortation Stimulus fundin U to $429,457 <br />TOTAL $1,325,678 <br />Planned Expenditures: <br />(~riainal Budaetl <br />Item Estimated Amount <br />.62 mile x 10' wide Concrete Greenway with one <br />111.5' x 10' Prefab Steel Bridge (Including clearing, <br />grading, one temporary bridge, sedimentation and <br />erosion control devices, raising one manhole and <br />temporary and permanent seeding) $894,098.54 <br />Additional Construction Administration Fee: <br />(Full Time NCDOT Concrete Certified Site Inspector) $ 81,400.00 <br />Geotechnical Testin $ 26,000.00 <br />Landscaping and Site Amenities: <br />(Signage, Benches, Doggie Waste Stations and Trash/ <br />$ 65,000.00 <br />Rec clin Rece tacles <br />Construction Contin enc 10% $ 89,409.85 <br /> <br />Total $1,155, 908.39 <br />Revised Twin Creeks Greenway Budget <br />Item Amount <br />.62 mile x 10' wide Concrete Greenway with one <br />111.5' x 10' Prefab Steel Bridge (Including clearing, <br />grading, one temporary bridge, sedimentation and <br />erosion control devices, raising one manhole and <br />temporary and permanent seeding) $498,992.40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.