Browse
Search
RES-2009-070 Supporting NCDOT Application for Funding for Southeast High Speed Rail Corridor
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2009
>
RES-2009-070 Supporting NCDOT Application for Funding for Southeast High Speed Rail Corridor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 9:50:47 AM
Creation date
11/24/2009 4:31:26 PM
Metadata
Fields
Template:
BOCC
Date
9/15/2009
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
4i
Document Relationships
Agenda - 09-15-2009 - 4i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2009\Agenda - 09-15-2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ -ice a s <br />R ~ S ~ ~~ - ~~ ° ~, <br />Attachment 1 3 <br />RESOLUTION SUPPORTING THE APPLICATION <br />BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION <br />FOR FUNDS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT AND <br />ANNUAL FEDERAL BUDGETARY.APPROPRIATIONS TO ACCELERATE THE <br />DEVELOPMENT OF THE SOUTHEAST HIGH SPEED RAIL CORRIDOR <br />WHEREAS, the United States Department of Transportation designated the <br />Washington-Richmond-Raleigh-Charlotte rail corridor for future high-speed rail <br />development in 1992; and <br />WHEREAS, a system of corridors have been designated nationally by the United States <br />Department of Transportation, one being the Southeast Corridor, as the above <br />described system is known; and <br />WHEREAS, extraordinary economic and population growth in the Southeast region <br />requires a comprehensive, multi-modal transportation system; and <br />WHEREAS, high speed rail service will provide business and leisure travelers with a <br />competitive alternative to air and automobile for trips between 100 and 500 miles; and <br />WHEREAS, much existing rail right of way is already in place which could <br />accommodate improvements to passenger rail service; and <br />WHEREAS, construction of a high speed rail corridor between Washington, DC and <br />Charlotte, NC through the Triangle region will provide transportation options, ease the <br />rate of congestion growth in the corridor, improve safety and energy effectiveness, <br />improve air quality and improve transportation efficiency while minimizing impacts; and <br />WHEREAS, an adjacent multimodal trail that would be constructed in conjunction with <br />the Southeast Corridor north of Raleigh will create an additional multimodal travel <br />option; and <br />WHEREAS, the North Carolina Department of Transportation has been actively <br />planning for and investing in the proposed Southeast Corridor in cooperation with the <br />Virginia Department of Transportation and other partners; <br />NOW, THEREFORE, BE IT RESOLVED the Orange County Board of Commissioners <br />supports the application by the North Carolina Department of Transportation for funding <br />from both the American Recovery and Reinvestment Act as well as from annual federal <br />budgetary appropriations in order to accelerate the ~ planning, land acquisition and <br />construction investments needed to help make the full implementation of the Southeast <br />High Speed Rail Corridor a reality. <br />
The URL can be used to link to this page
Your browser does not support the video tag.