Orange County NC Website
~~~ <br />6. The Measures Needed, Estimated Cost, and Financial Plan for Accam lish <br />See attached table. <br />7. Potential for ACP to Assist in Gettin Needed Land Treatment Measures •_ <br />Carrie Out - <br />The RC&D project is scheduled for 8 years, but the °ACP Special Fund," <br />.part of the assistance could easily be handled on a 3-year basis. The total <br />funds requested is $171,730 and we feel that there should be a requirement that <br />all conservation practices must be installed in a period of one year or funds <br />would be obligated to someone e1 se. <br />8. USDA Technical Assistance and Other Funds or Pro rams that will be Used <br />tv Im lament the Project <br />=.~. :.-...,.~To meet.the objective of this project, farmers who want to be involved • . <br />. must be cooperators of the Orange 5oi1 and Water Conservation District. With <br />the assistance of all local agencies - ASCS, SCS, NCFS, Extension Service and <br />other loco] agencies, a conservation plan will be developed for the protection <br />and maintenance of all practices to be cost_shared. Farmers will be responsible <br />• ~ for performing operation and maintenance. After the conservation plan has been <br />developed, an operation and maintenance agreement will be entered into between <br />- -.•-~ the Orange Soil and Water Conservation District, ASC County Committee, and the <br />Cooperator. <br />~~Operations and maintenance work will normally include such actions as <br />annual application of fertilizer to maintain vegetative cover, replacement of <br />spot loss that endangers the installation, repairing fences, replanting trees, <br />clearing debris that affect operation of works of ~mpravement, sealing or <br />repairing structures to prevent deterioration, and reseeding or resodding to <br />'1 <br />~.~. <br />~._. <br />y <br />;~ <br />:i <br />:~ <br />ensure stands of cover and vegetative control of undesirable plant growth. ;R <br />4 <br />z <br />