Browse
Search
Minutes - 19790102
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1970's
>
1979
>
Minutes - 19790102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2013 10:53:43 AM
Creation date
8/13/2008 12:26:51 PM
Metadata
Fields
Template:
BOCC
Date
1/2/1979
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ f9 <br />Agenda Item 11: Architect's Review of Bid Opening for <br />Remodeling Grady Brown <br />P1r. Joe ^lassif, Architect, reviewed the bid proposals. <br />--- <br />-:.- . <br />i- <br />C <br />E <br />Commissioner !•Jhitted said there is $1,915,000 in the building fund to <br />renovate 9rady Brown and remodel and make additions to the .jail. Renovating <br />f Grady Brown would consume all available funds. <br />j Mr. Nassif explained an alternative to accepting these bids woul•i be to <br />have contractors bid on their administrative cost; profiit and overhead - not <br />~aterlals'- --The _Qoar----- - -W---- g --- .... _....... - -. t sub-bids. <br />d could select •a__ eneral contractor and then_ac.cep _ _ <br />The Board would manage construction. with th.e general contractor.at a savings <br />of approximately 15 percent. Once the Baard selects a general contractor, it <br />-vould probably take three to four weeks to seek subcontractor's bids. <br />The Finance Director said available net debt reduction bonds.wi1l total <br />$Z15,OO0 on July 1, 1979 and, if we do not exercise the first option, will total <br />$3'5,000 on July 1, 1980. He suggested the Board allow far other commitments, <br />such as schools, which would come up during the year. <br />The County Manager said there was a possibility of renovating the <br />attics of the Social Services 3uilding (approximately 7,700 square feet) and <br />the Health Buildin3 (approximately 2,007 square feet) or makinn additions to <br />either buildin7. He said the Council on Aging can get a•grant ofi $57,00`) if <br />the Board decides to renovate rrady Brown. <br />Commissioner !Jhitted asked Brady Brown Renovation be placed on the agenda <br />for the third Tuesday meeting. <br />Agenda Item 13: Refuse Collection S stem <br />The County Manager said, with the landfill closed over the Christmas <br />holidays, the green box system was over taxed. He said a dinosaur system <br />would use larger containers owned by the county and would be located at the Chapel Hili <br />landfill and other sites developed or landscaped for that purpose. He said <br />the green box system was not designed to tarry surburban areas like Hillsborough <br />or Carrboro. He. .said the dinosaur program has worked well in Wilson County. <br />He said dinosaur boxes contain 1400 yards, while green boxes contain 3 to 4 <br />yards. Contractors charge $25 per load at the landfill and $45 per load to <br />collect at other sites. To empty boxes once a day would cost approximately <br />$15,000 per .year. <br />-9- .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.