Browse
Search
Agenda - 10-20-2009 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 10-20-2009
>
Agenda - 10-20-2009 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2009 9:25:11 AM
Creation date
10/20/2009 9:25:08 AM
Metadata
Fields
Template:
BOCC
Date
10/20/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
2009-084 EDC - Utility Extension Fund Agreement and Taylor Fish Farms
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Minutes - 20091020
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
RES-2009-075 Extending Water, Sewer & Electric Service Taylor Fish Farms Est Aquaculture Facility
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />l~/~~r~f-~irk'~~~ ~ ~v f~flGCh~~~ ~ .12-21-93 <br />UTI~,xTY EXTENSION k'UND PROCEDURES <br />Staff will review initial requests. <br />- Any recommendations far County participation should conform <br />with exist~.ng Water and Sewer Paliay requiring maximum 5- <br />yeax payback in increased property taxes. .Five years is a <br />maximum and staff is enoouraged to limit County <br />participation in any individual project so that more <br />pxojeats qan be considered. A project must also be <br />evaluated based on Goal 9:, Section of the Policy that <br />statest <br />1. The project must be assured of having the proper zoning <br />at the proposed site; and <br />2. The project must improve job opportunities available to <br />Orange County citizens, especially for women and <br />minorities; and <br />3. The project must provide jobs with wage scales in <br />compliance with Orange County standards adapted from <br />time--to-time; .and <br />~. The project must have a positive fiscal impact upon <br />Orange County government (The cast of services to be <br />provided by Orange County to the project must be less <br />than the local taxes and other revenues paid to the <br />.County generated by the project.). A fiscal impact <br />analysis shall be prepared by the applicant and verified <br />.by Orange county and using a model provided by Orange <br />County. <br />-- Once a request is made, the staff will present it to the EDC <br />fox a recommendation and then to the Board of County <br />Commissioners far a decision to proceed or nat. <br />- Reimbursements should be considered far eonstzuction and <br />engineering costs. <br />- Count funds should be used as repayment only after projects <br />are fa.nished and the County Engineer has insured substantial <br />completion and compliance to County standards. <br />- Staff should consider need, job creation, wage levels, long- <br />term repayment, long-term stability and any other criteria <br />established by the Board of County Commissioners before <br />making recommendations. <br />- The staff shall provide an annual review of projects funded <br />and their status and impact to the EDG Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.