Browse
Search
Agenda - 10-20-2009 - 4j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 10-20-2009
>
Agenda - 10-20-2009 - 4j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2009 8:57:57 AM
Creation date
10/20/2009 8:57:55 AM
Metadata
Fields
Template:
BOCC
Date
10/20/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4j
Document Relationships
Minutes - 20091020
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i~ <br />AIA Document B151-1997 page 16 <br />Proposed Piedmont Food and Agricultural Processing Center <br />ARTICLE 12 OTHER CONDITIONS OR SERVICES <br />12.1 The Designer's ability to adhere to the schedule proposed by the Owner is predicated upon <br />timely receipt of reviews and approvals from the Owner, authorized agencies or agents of the <br />Owner, consultants or contractor hired by the Owner and Iocal or state agencies haviung <br />jurisdiction over the project. It is Corley Redfoot Zack's understanding that the project will be <br />competitively bid and that the latest schedule provides milestone dates that lead to a proposed <br />completion date within the third quarter of 2010. <br />12.2 CONSTRUCTION PHASE: <br />During the construction phase of the work, the term "INSPECTION" shall be defined as <br />follows: <br />"Inspection shall consist of visual observations of materials, equipment or construction work for <br />the purpose of ascertaining that the work is in substantial conformance with the Contract <br />Documents and with the design intent. Others shall not rely upon such inspection as <br />acceptance of the work, nor should it be construed to relieve the Contractor in any way from <br />the obligations and responsibilities the Contractor assumes under the construction contract. <br />Specifically, but without limitation, inspection by the Design Professional shall not require the <br />Design Professional to assume responsibilities for the means and methods of construction, nor <br />for safety on the jobsite." <br />Add the following paragraph to Article 2.6.5: <br />"Site visits shall be made weekly, for the estimated seven- (~-month construction period and <br />are included under Basic Services. If additional trips are required for whatever reason, these <br />trips shall be deemed as Additional Services and will be billed at hourly rates (see 11.3.1). If the <br />completion date of the project is extended, Additional Services will be billed at hourly rates." <br />12.3 SERVICES NOT INCLUDED: <br />A. Services not included: <br />- Legal fees <br />- Geotechnical investigation <br />- Town permitting or approval process fees <br />- Renderings or models <br />- Construction Administration beyond Basic Services. <br />- Testing of materials during construction period. <br />- Asbestos survey or lead paint removal from existing building. <br />- Mileage Q $0.55/mile. <br />0910-con.12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.