Browse
Search
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2008
>
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 11:20:17 AM
Creation date
10/14/2009 4:46:54 PM
Metadata
Fields
Template:
BOCC
Date
2/25/2008
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
c-2-a
Document Relationships
Agenda - 06-03-2008-4aa
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 06-03-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br />d) If a structural analysis shows a tower is not in compliance <br />With the appropriate EIA standards, the owner shall submit <br />an application to the Inspections Division with a plan to <br />bring the tower into compliance within six (6) months. <br />e) Analysis of Existing Towers. Within twelve (12) months of <br />the effective date of this Ordinance an analysis by a North <br />Carolina Licensed Professional Engineer (P.E. Analysis) <br />shall be performed on all towers in excess of one hundred <br />L1001 feet in height and shall be submitted to the <br />Inspections Division. The analysis shall determine the <br />tower's compliance or lack thereof with the EIA standard in <br />effect at the time the tower was constructed and when the <br />most recent structural loading change was made. For all <br />towers less than six (6) years old, a current existing P.E. <br />analysis of the tower may be submitted in lieu of the new <br />P. E. analysis required above. If the tower does not meet <br />the aforementioned EIA standards, ' the letter or existing <br />P.E. analysis shall include the types of modifications that <br />would be required to bring the tower up to standard. All <br />existing towers shall be subject to the annual electrical <br />inspection conducted by the Inspections Division-including <br />any associated inspection fees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.