Browse
Search
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2008
>
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 11:20:17 AM
Creation date
10/14/2009 4:46:54 PM
Metadata
Fields
Template:
BOCC
Date
2/25/2008
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
c-2-a
Document Relationships
Agenda - 06-03-2008-4aa
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 06-03-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />explaining the purpose for the facility, such as coverage and /or <br />capacity, technical requirements, and the identified boundaries <br />of the specific geographic area of intended coverage; <br />2) Technical documentation demonstrating that the facility is <br />designed to provide the service type and service coverage <br />needed primarily within the County. Such documentation shall <br />include a propagation study of the proposed site and all <br />adjoining planned, proposed or existing sites, that demonstrates <br />a significant gap in coverage and /or, if a capacity issue is <br />involved, to include an analysis of the current and projected <br />usage (traffic studies) using generally accepted industry <br />methods and standards so as to conclusively prove the need for <br />what is proposed. <br />3) All of the modeling information used to produce the propagation <br />studies, including, but not limited to any assumptions made <br />about ambient tree height; <br />4) A copy of the FCC license applicable for the intended use of the <br />facility, as well as a copy of the five (5) and ten (10) year build - <br />out plan required by the FCC; <br />5) The frequency, modulation and class of service of radio or other <br />transmitting equipment; <br />6) The maximum transmission power capability of all radios, as <br />designed, if the applicant is a cellular or functional equivalent <br />carrier, or the maximum transmission power capability, as <br />designed, of all transmission facilities if the applicant is not a <br />cellular or functional equivalent carrier; <br />7) The actual intended transmission power stated as the maximum <br />effective radiated power (ERP), both in dBm's and watts; <br />8) A statement certifying that the facility and all attachments <br />thereto comply with the conditions of the approved Special Use <br />Permit. <br />9) The legal name, address, phone number, all necessary contact <br />information of the person preparing the application; <br />10)The name, address, phone number, and all necessary contact <br />information of the property owner, if the owner of the structure is <br />different than the applicant; <br />11)The postal address, tax map block and lot number, and parcel <br />identification number of the property; <br />12)A copy of the FCC license applicable for the intended use of the <br />facility. <br />13)The Zoning District and Watershed overlay in which the property <br />is situated; The area of the property on which the structure to be <br />attached to is located, stated both in square feet and acres and <br />perimeter lot line dimensions, and a survey showing the location <br />of all lot lines, metes and bounds, and all easements; <br />
The URL can be used to link to this page
Your browser does not support the video tag.