Browse
Search
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2008
>
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 11:20:17 AM
Creation date
10/14/2009 4:46:54 PM
Metadata
Fields
Template:
BOCC
Date
2/25/2008
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
c-2-a
Document Relationships
Agenda - 06-03-2008-4aa
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 06-03-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br />2) An engineering permit fee shall be paid if a pole is replaced to <br />accommodate telecommunications equipment. <br />3) Public land or right -of -way lease agreements will be established <br />by separate instrument. <br />6.18.4 Minimum Standards for Telecommunications Tewersr- Wireless Suanort <br />Structures Not Requiring a Special Use Permit <br />Prior to issuing a building permit for the collocation of an antenna array on <br />an existing facility, an applicant shall demonstrate that the collocation is <br />located appropriately on the facility with the overall coal being to preserve <br />the carrying capacity of the facility for future collocations and to minimize <br />the visual intrusiveness and impact. including the profile of the facility. <br />In determining the necessary height for a facility.. or the height of a <br />collocation on a facility, the signal strengths analyzed shall be the <br />threshold or lowest signal strength at which the customer equipment is <br />designed to function, which may be required to be determined__by the <br />manufacturer's published specifications for the customer equipment. All <br />telecommunications towers wireless support structures must meet the following <br />minimum standards: <br />a) Prior to the issuance of a Building /Electrical Permit by the Inspections <br />Division, a site development plan prepared in accordance with Article XIV <br />shall be presented for approval to the Planning Division. Each application <br />for a proposed telecommunications tower shall include all requirements <br />for site development plan approval as. required. Approval of the Planning <br />Director or his /her designee to verify consistency with the definition of <br />stealth facility is required. Each application shall contain a rendering or <br />photograph of the tower including, but not limited to, colors and screening <br />devices. <br />b) All telecommunications towers shall be placed in heavily wooded areas <br />on the site to the maximum extent possible so as to lessen the visual <br />intrusiveness of the structure and accessory structures. A statement shall <br />be submitted by the applicant stating how the proposed tower will <br />minimize visual intrusiveness to surrounding properties in the area. <br />Criteria that may be used for such evidence may be height and type of <br />existing trees surrounding the proposed tower, and local topography. <br />c) A statement shall be submitted, prepared by a professional engineer <br />licensed in the State of North Carolina, which through rational engineering <br />analysis, certifies the tower's compliance with applicable standards as set <br />forth in the State of North Carolina Building Code, and any associated <br />regulations; and describes the tower's capacity, including an example of <br />the number and type of antennas it can accommodate. <br />d) Applicants shall provide at time of application submittal: <br />1) the existing cell sites (latitude, longitude, power levels) to which <br />this proposed site will be a handoff candidate; <br />
The URL can be used to link to this page
Your browser does not support the video tag.