Browse
Search
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2008
>
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 11:20:17 AM
Creation date
10/14/2009 4:46:54 PM
Metadata
Fields
Template:
BOCC
Date
2/25/2008
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
c-2-a
Document Relationships
Agenda - 06-03-2008-4aa
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 06-03-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />public or private, shall be made to the extent practicable. <br />Road construction shall at all times minimize around <br />disturbance and reduce soil erosion and shall comply with <br />any County or State regulations for the construction of roads. <br />If the current access road or turn around space is deemed in <br />disrepair or in need of remedial work to make it serviceable <br />and safe and in compliance with any applicable regulations <br />as' determined at a site visit. then the Application shall <br />contain a commitment by the applicant to remedy or restore <br />the road or turn around space so that it is serviceable and <br />safe and in compliance with applicable regulations. <br />f) In addition to the foregoing, applicants applying for permission to <br />attach the first antenna to an approved wireless support structure <br />shall also provide the follow(ing: <br />1) A detailed narrative description and explanation of the <br />specific objective(s) for the new facility, expressly including <br />and explaining the purpose for the facility, such as_ cove <br />raQe <br />and/or capacity, technical requirements. and the identified <br />boundaries of the specific geographic area of intended <br />coverage: <br />2) Technical documentation demonstrating that the facility is <br />designed to provide the service type and service coverage <br />needed primarily within the County. Such documentation <br />shall include a propagation study of the proposed site and all <br />adioining planned. proposed or existing sites, that <br />demonstrates a significant gap in coverage and /or. if a <br />capacity. issue is involved, to include an analysis of the <br />current and projected usage (traffic studies) using generally <br />accepted industry methods and standards so as to <br />conclusively prove the need for what is proposed. <br />assumptions made about ambient tree height: <br />4) A copy of the FCC license applicable for the intended use of <br />.the facility, as well as a copy of the five (5) and ten (10) year <br />build -out plan required by the FCC: <br />5) The freauencv. modulation and class of service of radio or <br />other transmitting equipment: <br />6) The maximum transmission power capability of all radios, as <br />designed. of all transmission facilities if the applicant is not a <br />cellular or functional eauivalent carrier: <br />
The URL can be used to link to this page
Your browser does not support the video tag.