Browse
Search
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2008
>
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 11:20:17 AM
Creation date
10/14/2009 4:46:54 PM
Metadata
Fields
Template:
BOCC
Date
2/25/2008
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
c-2-a
Document Relationships
Agenda - 06-03-2008-4aa
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 06-03-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and black striped warning tape or a suitable warning barrier, as <br />well as placing RF radiation signs as needed and appropriate to <br />warn individuals of the potential danger; <br />17) A signed statement that the applicant will expeditiously <br />remedy any physical or RF interference with other <br />telecommunications or wireless devices or services caused by <br />the new installation. <br />18) The applicant shall provide a certification by a Professional <br />Engineer licensed in the State, along with documentation (a <br />structural analysis), including calculations, that prove that the <br />wireless support structure and its foundation as proposed -to be <br />utilized are designed and were constructed to meet all County. <br />State, federal and ANSI structural requirements for loads. <br />including wind and ice loads and the placement of any <br />e uipment on the roof a building after the addition of the <br />proposed new facilities. <br />19) Any application that proposes to- locate a facility on County <br />owned or leased property shall contain a provision with respect <br />compensatory or punitive, or expenses arising there from, either <br />at law or in equity, which might arise out of, or are caused by <br />the placement, construction, erection modification, location. <br />performance, use, operation, maintenance, repair, installation, <br />replacement, removal, or restoration of said facility, excepting. <br />however: any portion of such claims, suits: demands, causes of <br />action or award of damages as may be attributable to the <br />negligent or intentional acts or omissions of the County. or its <br />servants or agents. With respect to the penalties. damages or <br />charges referenced herein, reasonable attorneys' fees . <br />consultants' fees. and expert witness fees are included in those <br />costs that the County can recover. Notwithstanding the <br />requirements noted above, an indemnification provision will not <br />be reau'red in those instances where the County itself applies <br />for and secures a Special Use Permit for a wireless facility. <br />design criteria: <br />1) In order to protect the nature and character of the community <br />wherein the facility is proposed, and in order to create the <br />least visually intrusive impact reasonably possible. any <br />
The URL can be used to link to this page
Your browser does not support the video tag.