Orange County NC Website
tower. If an ANSI report has not been done pursuant to the <br />preceding schedule. an ANSI report shall be done an <br />submitted as part of the application. No Building Permit shall be <br />issued for any wireless support structure where the structure <br />being attached to is in need of remediation, unless and until the <br />County Planning and Inspections Department has approved all. <br />131 A Structural Report signed by a Professional Engineer <br />licensed to do business in the State and bearing that engineer's <br />currently valid stamp, showing the structural adequacy of the <br />wireless support structure to accommodate the proposed <br />the lowest floor of a building; <br />14) If attachina to a structure other than a tower or where the <br />proposed attachment is within thirty (30') feet of areas to which <br />the public has or could reasonably have or gain access to^ <br />documentation shall be provided, including all calculations, <br />proving that the potential exposure to RF radiation (i.e. Non -Ion <br />Emitting Radiation), will be comply with the most recent FCC <br />regulations governing RF radiation and exposure thereto, and <br />radiation in excess of the FCC's permitted standards and any <br />portion(s) of the structure that would be exposed to RF radiation <br />in excess of the FCC's permitted standards. Compliance with <br />the FCC's reaulations, in such an instance the RF radiation from <br />all facilities. at that location shall be included in the calculations <br />to show the cumulative effect on any area of the building or <br />structure deemed accessible by the public or workers. Such <br />report or analvsis shall be sianed and sealed by a Professional <br />Engineer licensed in the State. <br />15) If the modification or antenna arrav Collocation is thirty (30' <br />feet or more above around level. then a sianed document sucl <br />as the FCC's "Checklist to Determine whether a . Wireless <br />support structure may be Categorically Excluded" shall be <br />provided to verify that the modification or antenna array co- <br />location will fully comply with the current FCC's RF emissions <br />regulations. If not categorically excluded, a complete RF <br />emissions study is required to enable compliance verification. <br />including providing all calculations so that such may be verified <br />prior to issuance of a Building Permit- <br />radiation, that section or portion must be barricaded with a <br />suitable barrier to discourage approaching into the area in <br />excess of the FCC's regulations. and be marked off with yellow <br />