Browse
Search
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2008
>
ORD-2008-013 - Telecommunication Wireless Facility Zoning Ordinance Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 11:20:17 AM
Creation date
10/14/2009 4:46:54 PM
Metadata
Fields
Template:
BOCC
Date
2/25/2008
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
c-2-a
Document Relationships
Agenda - 06-03-2008-4aa
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 06-03-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35 <br />b) Permitted facilities fall <br />into such a state of disrepair that it <br />creates a healt <br />or safety hazard: <br />c) Facilities have been <br />located, constructed. <br />or modified <br />without firs <br />obtaining, or in a manner <br />not authorized <br />bv, the required <br />Special Use <br />Permit, or any other <br />necessary authorization <br />and the Special <br />Use Permit <br />may be revoked. <br />If the County makes such a <br />determination as noted <br />above, then <br />the County_ shall <br />notify the holder of the facility <br />Special Use Permit <br />within forty <br />-eight (48) hours <br />that said facility shall be removed. <br />the County may <br />approve an <br />interim temporary <br />use agreement/permit, such <br />The holder of the Special <br />as to enable the sale of <br />Use Permit. or - its <br />the facility. <br />successors <br />or assigns. shall <br />dismantle' and remove such <br />facility, and alL associated <br />structures <br />from the site <br />access to the facility. the owner may do so with the approval of the County. <br />iJTI i1FTil al •uMOI-A <br />_Notwithstanding anything in this Section_ to the contrary, the County may approve <br />temporary use permit/agreement for the facility, for no more than ninety (90) <br />days, during which time the holder of the Special Use Permit shall develop <br />provided in this Section and utilize the bond. <br />8.8.17a.4. Bond Security. <br />The applicant and the owner of record of any proposed facility aropedy site shall. <br />at its cost and expense, be jointly required to execute and file with the County a <br />bond, or other form of security acceptable to the County as to type of security <br />and the form and manner of execution in an amount of at least $75,000.00 for a <br />tower and with such sureties as are deemed sufficient by the County to assure <br />prior to the issuance of the original Special Use Permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.