Browse
Search
ORD-2008-012 - Orange Co Zoning Ordinance -Buckhorn Rd Associates LLC Rezoning
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2008
>
ORD-2008-012 - Orange Co Zoning Ordinance -Buckhorn Rd Associates LLC Rezoning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2013 8:45:29 AM
Creation date
10/14/2009 4:31:42 PM
Metadata
Fields
Template:
BOCC
Date
2/25/2008
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
c1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roger Perry: I'm with East West Partners, I have been in Orange County approximately 25 <br />years. I have been sworn in. He continued with the presentation as shown below. <br />SUSTAINABILITY <br />• Site Selection & Design <br />• Water Efficiency <br />• Energy and Atmosphere <br />• Materials and Resources <br />• Indoor Environmental Quality <br />Site Selection and Design <br />• Site Designated as Economic Development District <br />• Previously Developed Site (flea market & farmed timber) <br />• Multi-Use Development Program reduces trips <br />• Provide Carpool/Vanpool Information (kiosk, bulletins, etc.) <br />• Provide Bus Loading Stations and Bus Route Information <br />• Comply with EPA and NPDES Standards for Pollutant Discharge (including bio-swales <br />for infiltration, etc.) <br />• Storm Water Retention for BOTH 1 yr. and 2yr. Design <br />• Plan for "Walkability" in Site Design <br />Water Efficiency <br />• Plan for Water Efficient Landscaping <br />• Use ONLY Reclaimed Stormwater for Irrigation <br />• Use Low Flow Water Fixtures <br />• Make available Reclaimed Stormwater for Tenants HVAC Needs <br />Energy ~ Atmosphere <br />• Reducing Energy Needs by Use of Day-Lighting in Architectural Design <br />• Engage in 2yr. Contract for 35% of Energy from Renewable Sources <br />• Work with Tenants on Requiring <br />• Commissioning of Building Energy <br />• Enhanced Energy Performance <br />• Refrigerant Management <br />• Use High Reflective Roofing Materials in Architectural Design <br />Materials 8~ Resources <br />• Comply with Orange County Solid Waste Management to Provide a Waste Stream Audit <br />• Provide easily Accessible Areas for Recycling & Waste Collection <br />• Include Individual Waste and Recycling Collection Points for Use by Patrons <br />• Work in Collaboration with Orange County in helping Tenants on Diverting Construction <br />Waste <br />Indoor Environmental Quality <br />• Work with Tenants on Meeting Environmental Tobacco Smoke (ETS) Standards <br />• Work with Tenants on the Use of LOW VOC Emitting Adhesives, Paints, and Other <br />Construction Materials <br />
The URL can be used to link to this page
Your browser does not support the video tag.