Orange County NC Website
12 <br />b) Permitting limited non-residential growth on Mt. Willing Road on the <br />south side of the Interstate in the vicinity of West Ten Road should be <br />studied given the proximity of the area to Gravelly Hill Middle School and <br />West Ten Soccer Park. (A revision to the WSMPBA Map would be <br />required to implement this recommendation). <br />c) The need for additional water quality Best Management Practices (BMPs) <br />should be evaluated since Seven Mile Creek would continue to be a water <br />supply watershed. <br />Southwest Portion of Planning Area <br />The City of Mebane annexed a parcel of land in the southwest portion of the planning area after <br />the planning area boundary was established. The annexed parcel is labeled on Map 27. As was <br />discussed in the Water and Sewer System portions of this small azea plan, Orange County and <br />the City of Mebane have a Utility Service Agreement pertaining to the existing Economic <br />Development Area. The following recommendations are made regarding the southwest portion <br />of the planning azea: <br />1. The land use classification of the area designated as " 3" on Map 12 should be changed <br />from CommerciaUIndustrial Node to Economic Development with future water and <br />sewer service to be provided by the City of Mebane. <br />2. The land use classification of the area designated as "6b" on Map 12 should be changed <br />to Mixed Use with future water and sewer service to be provided by the City of Mebane. <br />(Note that this azea is not designated as a Primary Service Area on the current WSMPBA <br />Map; Orange County action on providing water and sewer service to azea 6b will require <br />revisions to the WSMPBA map). <br />Northern Portion of Planning Area <br />Much of the northern portion of the planning azea was previously designated as 10- and 20-Year <br />Transition Areas. Additionally, much of the north portion of the planning area is within Orange <br />County's Primary Service Area for water and sewer services under the WSMPBA. The <br />following are recommendations pertaining to the northern portion of the planning area: <br />1. Change the 10- and 20-Year Transition Area designation to "Efland Transition Area." <br />2. Change the portion of the planning area north of the "Efland Transition Area" area but <br />within the WSMPBA Primary Service Area to "Efland Transition Area Reserve." <br />3. If the Water and Sewer Management Planning and Boundary Agreement is revised in the <br />future, as is recommended in the Water and Sewer recommendations, the portions of the <br />70 <br />