Browse
Search
ORD-2009-099- Fiscal Year 2009-10 Budget Ordinance Orange County North Carolina
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2009
>
ORD-2009-099- Fiscal Year 2009-10 Budget Ordinance Orange County North Carolina
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2011 12:54:20 PM
Creation date
9/21/2009 12:32:39 PM
Metadata
Fields
Template:
BOCC
Date
6/16/2009
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
6-2-a
Document Relationships
Minutes - 20090616
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FY 2009-10 Proposed Changes to the County Fee Schedule 4$ <br />Descri lion Current Fee Pro osed Fee FY 2009-10 Last Revision <br />AthleBc Field LI htin $20/field/hr 2007 <br /> <br />Vendin $100-$300Poooth (event size); <br />$50/booth for charitable rou <br />2007 <br />Non-Conn Resident Fee Additional 5D% to a Iced fee 2D07 <br />Picnic Shelter $20 1-4 hrs ; $30 4+ hrs ~ 2007 <br />Grou Camping $5D/night er ro of 6-30 $30 ~ rou of 6-30 2007 <br />Equi ment Rentals <br />Recreational a ui ent varies <br />Solid Waste (Enterprise Fund <br />Descri lion Current Fee Pro osed Fee FY 2009-1D Last Revision <br />Landfill and Re clip <br />"Waste Redudion, Reuse, and <br />R cling Fee <br />Basic Fee $37.00 2007 <br />Urban Curbside (a ded to Baslc <br />Fee r~J <br />$44.00 + $37.00 = $81.00 <br />$52.00 + $37.00 = $89.00 <br />2007 <br />Rura! Curbside (added to Baslc <br />Fee) m <br />$26.00 + $37.00 = $63.00 <br />$38.00 + $37.00 = $75.00 <br />2007 <br />Mulitfami! added to Baslc Fee $19.00 + $37.00 = $56.00 2007 <br />"'Mixed Waste t' $49.00/ton $50/ton 2006 <br />"'Construction & Demo t'i $43.00/ton $44/ton 2006 <br />Clean WoodN etative Waste t'i $15.00/ton $18.00l1on 2001 <br /> <br />Clean Wood (non tonnage fee t'I minimum $7.OD/bad for pick-up or <br />trailer minimum $B.OD/load for pick-up <br />ar trailer <br />2000 <br /> <br />MSW/C&D (non tonna a fee t't $ZO.OOfload for pick-up or trailer, <br />$5.00%ar $22.00/load for pick-up or small <br />trailer <br />2DD0 <br />Mulch Out t't $20.00/swo $2200/scoo 2006 <br />Tires (stodyNles tires/no state <br />certifigtion) <br />$100.00/ton <br />1997 <br />Ilances White Goods No char e <br />Scra Metal No charge <br />Cardboard No ch e <br />Regulated Recyclable Materials <br />Permit <br />5% of assessed buliding ennft Fee <br />2002 <br />Regulated Recydable Materials <br />License <br />$25.00/vehide <br />2002 <br />Regulated Recydable Materials . <br />Facfti Certification <br />$250.OD/a Ilcafion <br />2002 <br />Combined Load Re dables $15.00/ton 2002 <br />Regulated Material Permit-Town of <br />Chapel HAI 8% of Applicable Building Permit <br />Fees <br />20D8 <br />" Fees charged on all improved properties to fund recyding and waste redudion servkes. For mulrrfamily, the property is <br />charged one fee for each dwelling unit <br />"' Effective July 1, 2008, the State of NC required a $2 per ton tax on every ton of waste received at the landfill. These fees will be <br />passed direc8y to the state each month. The County retains rmne of these fees. <br />6of7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.