| 3.2 CMAR Personnel 
<br />The services to be provided by the CMAR under this 
<br />Agreement shall be performed by personnel identified by the 
<br />CMAR, and approved by the Owner, before commencing 
<br />services. The furnishing of services by such personnel 
<br />throughout the duration of the Project, and any individuals 
<br />approved by the Owner to replace them, is of the essence to 
<br />this Agreement. 
<br />3.2.1 Additions, Removals Replacements 
<br />From time to time, personnel may be added as necessary and 
<br />appropriate to the stage of planning, programming, designing 
<br />and constructing the Project. The CMAR shall anticipate the 
<br />need for such additional personnel by submitting to the Owner, 
<br />no later than seven (7) days prior to the need for the additional 
<br />personnel, a list of the proposed additional personnel, attaching 
<br />the resumes of proposed additional personnel, and stating the 
<br />reasons for such additions. The Owner shall. promptly review 
<br />the proposed additions and either approve or disapprove the 
<br />additional personnel In writing. The CMAR shall not employ 
<br />any individual to perform the functions of any approved 
<br />personnel without the advance approval of the Owner, which 
<br />approval may be granted or withheld in Its sole discretion. The 
<br />CMAR shall not for so long as any approved person Is 
<br />employed by the CMAR, remove, substitute or reduce the time 
<br />devoted to the Project by such person without the Owner's 
<br />prior written approval, which may be granted or withheld In Its 
<br />sole discretion. If the Owner is for any reason dissatisfied with 
<br />the services rendered by any approved person, the CMAR 
<br />shall promptly remove such person and recommend a 
<br />replacement. If any approved person ceases employment with 
<br />the CMAR, or If the Owner requests the removal of any such 
<br />person, then the CMAR shall promptly notify the Owner of a 
<br />proposed substitute of at least equal qualifications to perform 
<br />the same functions, and provide a resume .for the substitute. 
<br />Each substitute person must be approved by the Owner prior to 
<br />commencing performance of any services for the Project, which 
<br />approval may be granted or withheld in the Owner's sole 
<br />discretion. The CMAR shall bear, at its own expense and 
<br />without reimbursement by the Owner, all costs associated with 
<br />replacing, for any reason, any approved personnel. The CMAR 
<br />shalt remain solely responsible to the Owner, notwithstanding 
<br />the Owner's approval of any approved personnel, for the 
<br />quality and performance of all services provided by such 
<br />personnel. 
<br />Q 
<br />3.2.2 CMAR's Proiect Representative 
<br />The CMAR shall designate a Project Representative who has 
<br />the authority to act on behalf of the CMAR In respect to all 
<br />matters that are the subject of this Agreement, including, 
<br />without limitation, the power and authority to enter into 
<br />agreements or modifications that contractually bind the CMAR. 
<br />The Project Representative shall be available at all times 
<br />during all phases of performance of services under this 
<br />Agreement to consult with the Owner on matters pertinent to 
<br />design and construction of the Project. 
<br />3.2.3 CMAR's Employees 
<br />None of the persons employed by the CMAR shall be 
<br />considered employees of the Owner. The CMAR shall be 
<br />solely responsible for any workers' compensation obligations, 
<br />withholding taxes, unemployment insurance, compliance with 
<br />immigration and licensing laws, and any other employer 
<br />obligations with respect to all of their respective employees. 
<br />3.3 Construction Management Plan 
<br />Within 30 , days after execution of this Agreement, 
<br />the CMAR shall present to the Owner a Construction 
<br />Management Plan for the Project, including dates by which 
<br />deliverables required by the Construction Management Plan 
<br />will be completed. The CMAR shall make recommendations for 
<br />revisions to the Construction Management Plan throughout the 
<br />duration of the Project, as may be appropriate. In preparing 
<br />the Construction Management Plan, the CMAR shall consider 
<br />the Owner's schedule, budget, and design requirements for the 
<br />Project. The CMAR shall then develop various alternatives for 
<br />the sequencing and management of the Project and shall make 
<br />recommendations to the Owner. The Construction 
<br />Management Plan shall also Include a description of the 
<br />various bid packages recommended for the Project. The 
<br />Construction Management Plan shall be presented to the 
<br />Owner for acceptance. Revisions approved by the Owner shall 
<br />be incorporated into the Construction Management Plan. 
<br />3.4 Consultant Selection 
<br />If requested by the Owner, the CMAR shall assist the Owner in 
<br />the selection of designers and other consultants necessary for 
<br />the Project (generally referred to in this Agreement as 
<br />"Consultants ") by developing lists of potential firms, developing 
<br />criteria for selection, preparing and transmitting the requests for 
<br />proposal, assisting in reviewing written proposals, assisting in 
<br />conducting Interviews, evaluating candidates and making 
<br />recommendations. 
<br /> |