Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shown at that time toba incomplete ordefective. Within thirty (30) days of receipt -of any <br />deficiency list, the Contractor shall complete and correct all items on that list along with all <br />other Work required to achieve Final Completion of the Work. At -any time prior to <br />completion of the period of warranty, the CMAR may submit to the Contractor s ' upplemental <br />deficiency lists, in which'case the Contractor shall complete or correct any and all new <br />items identified on the supplemental deficiency lists within the time period stipulated in <br />paragraph 18.3 of these General Conditions. <br />21.3 Thennekinoond- uccephancaofFinu shall constitute a waiver of all claims bvthe <br />CMAR except: <br />a) Claims arising from unsettled liens or claims against the Contractor. 6\ Defective Work ormaterials appearing after Final Payment. <br />C) Failure of the Contractor to perform the W o*rk in accordance with'tmContract <br />Documents. <br />d� As conditioned in the Performance Bond. <br />P) Claim smade prior to Final Payment which remain unsettled. <br />f) Amounts due arising under Articles 18 and 28 of these General Conditions. <br />o <br />�' 1 Claims for recovery of overpayment based upon incorrect measurement, estimate, <br />or certificate. <br />21,4 The making and acceptance of Final Payment shall constitute a waiver of all claims bvthe <br />*Contractor except those dginna previously made in writing pursuant to paragraph 15.2 of <br />these General Conditions and not finally resolved: <br />21.5 The CK8AFl-shall not berequired to make Final Poymantun|esm'and until Designer <br />hag certified based oDtheI}esigne/eobservations and information that all of the Work bv <br />the Contractor under the Contract Documents has been completed in accordance with the <br />_ <br />Contract Documents, and (H) the Work by the Contractor has been approved by all federal, <br />, <br />state ond|000|aganoieehoving'urisd\cdon. <br />21.6 |ko* final Request for Payment shall be identified on its face as such and ehnU be <br />presented by the Contractor to the CMARvvithin thirty (30) daye -ofcomp(etion of the Work. <br />Final payment of the retained amount 'due the Contractor ohoU be made by the {}K8&Fl <br />within thirty (30) days after the later ofUlfull and Final Completion of all Work required of <br />the Contractor by the Contract Documents, and certification of such Work. in accordance <br />'with paragraph 21.5; 0i\ submission of the affidavits and other documentation required by <br />Article 22; (ii!) submission by the Contractor of a Request for Payment identified on its face <br />as final. <br />ARTICLE 22. Cg0TRACTORLSWB��ONTRACTOF�AN�� SUPPLIER �AFFIDAV� <br />22� The Final Payment due the Contractor on Documents of U�m Contract Doouan�a shall not <br />become due until the Contractor has furnished to the CK8AR: (A) an affidavit by Ule! <br />' <br />Contractor' signed, and notarized to the effect that all payments for rnederaio. <br />� <br />services, or for any other reason in connection with the VVod« or performance of the <br />Contract Documents have been satisfied and that no c|oin\e or -liens exist against the <br />Contractor in connection with the same; (B) edfidavito from each Subcontractor and supplier <br />signed, sworn, and notarized to the effect that (i) each such Subcontractor or supplier has <br />been paid in full bvthe Contractor for all Work performed and/or materials supplied.by ithl <br />GENERAL CONDITIONS FOR CK8AT RISK PROJECT 87of42 <br />�.� <br />JUNE 2OU7EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.