Orange County NC Website
whereupon the Contractor shall ou proceed — and heen � such form oomay <br />be required |account of ' oUproper �� <br />voen, <br />payro|o, and supporting data therefore. <br />together <br />15/4 Where the Contract is to the following limitations shall / in <br />determining the onnzuntof � <br />(a) In the case of extra or emergency work, the Contract Price shall not be increased by ' ^ <br />work plus ten percent (1D96)of such net cost on Work performed by the Contractor and <br />five percent (5%) thereof on any subcontracted Work for overhead and profit combined. <br />(b) In the case ofadecrease in Work, the Contract Price shall not be decreased bv|eaa <br />than the net cost of the deleted VVorkplus five percent (596\ of such direct net cost for <br />pro�tandowarhaad. ' ' ' <br />. <br />The term 'net cost as used herein shall include, as e, and shall be limited to, all <br />direct labor, direct mateho], direct equipment, labor burden, eo|an toxeo, shipping and <br />handling charges, permits and fees, and insurance and bond premium ocUuatnenta,�any, <br />attributable to the change. All other items of cost ohaU be considered -o overhead and <br />covered bythe percentages allowed iO sections (a) and /b\of this paragraph. <br />The Contractor shall -a method by which the <br />direct net cost was calculated, and shall provide all data needed to support the calculation <br />of the direct net cost, all ina form acceptable b» the CN1AR. <br />ARTICLE 10. UNFORESEEN CONDITIONS <br />16.1 Should the Contractor encounter unforeseen conditions at the Project site <br />differing from thone ohown*oD the|D or indicated in the Specifications 'or differing <br />`^ <br />materially from those ordinarily encountered and generally recognized as inherent in work <br />of the character provided for In this Agreement, the Contractor shall immediately, and in no <br />event more than three (3) days later, give notice to the CMAR of such conditions before <br />they are disturbed, The CMAR shall thereupon promptly notify the Designer and Owner <br />and investigate the conditions. The'CMAR shall as soon as practicable request that the <br />Designer make'such changes* in the Dravvings and/or Specifications as the CIVIAR and the <br />Contractor believe are necessary -- continue the Work. Any "crease or decrease ".the <br />Contract Price resulting from such changes ohoU be adjusted in the manner provided <br />herein for adjustments oato extra and/or additional Work and changes. The CYNARshall <br />not be liable or responsible for additional work, 000tn, or changes to the Work that could <br />have been reasonably determined from any reports, surveys, and analyses made available <br />for the Contractor's review orthat could have been discovered by the Contractor through <br />the performance of its obligations pursuant to the Contract Documents. <br />ARTICLE 17' CORRECTION OF WORK BEFORE FINAL PAYMENT <br />17.1 The Owner and the CK8AR -have-the authority to stop or suspend Work and to order Work <br />removed or to. order corrections of defective Work or Work not in compliance with the <br />Contract Documents where such action may be necessary to ensure successful completion <br />of the Work. <br />` ' <br />work, materials, fabricated items, or-other parts of the.Work which have been found bv <br />the <�K�AR, the [Jwx\er:orthe*Oeeignarto-be defeobVe or not in pcoordenco*vv�h. ' <br />� <br />Contract Documents shall 'bocondemned and shall ba removed from the Project <br />Con�aotor, and hnrnedkab�y reoaced by -new Work in accordance vv�H � ' the <br />GENERAL CONDITIONS FOR CK8AT RISK PROJECT -32of42' 'JUNE 2007 EDITION <br />. ' <br />