14.5 Increases in the Contract Price and/or extensions of the Contract Tkne.for Work <br />performed by the Contractor ehd| only be in accordance with written Change Order or <br />Construction Change Directive a|gnodbvtheCMAR. The Contractor shall not baentitled <br />-to additional time o- to additional compensation for'anyVVork ehornled o material <br />supplied which is claimed to have been authorized or settled by an "ovay' ohonge, or by o <br />"uonatruoUve"or"imp|ied" change, orbna course of conduct, nrbv any acOonbrnon-action <br />[� <br />by the* yNAF<. or any other penaono, or by any means whatsoever ' othsrlhan by a written <br />Change Order nr Construction Change Directive for such Work ormaterial signed by the <br />14]6 Changes in the Work resulting from emergency shall not invalidate the Contract Documents <br />nor release the surety if the Contractor kabonded. <br />14.7 The CMAR shall not Le responsible for verbal instructions which have not been confirmed m writing, and mno case shall such instructions be interpreted as permitting a departure <br />from the Contract Documents unless such instruction is confirmed \n writing and sV�porbad <br />by proper Change Order, Construction Change Diroc�ve or Field Order, whether � or not <br />the cost is affected. <br />14.8 If the Contractor is bonded. the CK8AR, in its sole discretion, require that the <br />Contractor notify the Contractor's oumUoa of any changes affecting the oa)ena| scope of <br />'the Work or change in the Contract Price, and that the amount of applicable bonds shall be <br />adjusted accordingly. If this requirement is exercised, the Contractor shall furnish proof of <br />such adjustment CM <br />AR. <br />Jfthis requirement is exercised, the Change Orders and Construction Change Directives <br />snoo require written* consent of the Contractor's surety. At the time of signing a Change <br />Drder, the Contractor shall be required to certify mafollows: <br />` l certify that all sureties hav� been notified that 0y contract has been altered by <br />` *the amount ofthis Change Order or Construction e Change copy <br />�ofth <br />. approved Change <�hangeDirective will be mailed to <br />� . <br />all sureties upon its receipt bvmm." <br />If this requirement is exercised, no payment to the Contractor on account of any Change <br />OrdororCenetruntioDChangoDireotiveohaUbecomedUoorpayab|euhti|wdttenevidonoo <br />' <br />of the ourety'5 consent to the Change Dndo, or'Conatnucbon Change Directive has been <br />furnished to the CK4AR, and thafurniohing of.such written consent ia 000nd\tion precedent <br />to such payment. <br />14.9 The Contractor oheU support all requests for Change Orders vvith o detailed co t <br />breakdown showing coat of materials', labor, equipment, tronaporUabon, other itenls. <br />Contractor'ooverhead and profit, and total cost, in accordance with methods defined in this <br />Article, and' if the request seeks on extension of the Contract Time, with a time-related <br />diagram which demonstrates specifically why an increase in construction time is needed. <br />*� <br />14.10 �VVhenorequea for a Change Order involves e Subcontractor, the Contractor shall provide <br />' <br />quotation from same on Subcontractor's |etterhead..The Subcontractor's quote shall list <br />0ateria|o, equipment, and labor separately, and show overhead and profit in the manner <br />provded in paragraph 14.8. % <br />ARTICLE 15.' CHANGE OF THE CONTRACT PRICE <br />The 'Contract Price constitutes the total cornpanaaUpn to -the Contractor for <br />performing �o||VVurh und�r th� Contract [)onurnontm. All duties,.- responsibilities,' and <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT* 30 of 42 JUNE 2007 EDITION <br />