Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13`16 `�he Contractor specifically 'recognizes that a ' . actor in achieving any <br />Completion Date can have the effect of delaying the Substantial. Completion of the Project, <br />or could- force the CMAR to accelerate the Contractors Work or the work of other <br />contractors. ' - Such delay in achieving a Completion Date will necessarily cause darnages,. <br />losses, an~ expenses to the CMAR, Including, but*not limited to and by way of illustration only, liquidated damages <br />increased - and extended Project overhead, increased fees <br />increased -and extended operation costs ofotherfao|Ki'� increased rd�costs and -loss ----` <br />prod bonem and may recovered ' the Contractor <br />and.� the Con�mc1oriabonded.�u surety. <br />' - <br />' <br />13.17 The, sum for liquidated damages payable to the Owner is the amount stipulated in the <br />CMAR Contract and reasonably estimated in advance to cover the losses to be incurred by <br />the Owner by reason of failure of said CMAR and the Contractor(s) to complete the Project <br />ARTICLE 14. CHANGES IN THE WORK <br />14`1 Without invalidating the Contract Documents, CNAR0ey ' at any time, nr from time' -to time n� order additions, deletions, or revisions in the Work, aid odditiuno ' -deletioOa' or <br />revisions shall be authorized only by written Change Orders, Construction Change [inaotivea or Field Orders. Upon receipt ofo Change Order, Construction Change Dire--'e <br />.or Field Order, the Contractor shall proceed with the Work involved. All such Work shall be <br />executed under the applicable conditions of the Contract [ocun K any change causes <br />en.|ncreoaw or daoreooa in the Contract Price end/or on euten ion or shortening of the <br />Contract Time, acUbat0oOby shall be made as provided in Article 14 and/or Article 15 of <br />these General Conditions. <br />14.2 If possible, Work shall not begin on any change oreUeratkoh to the until 6 - n <br />Change Order � executed oe�ingany change � the -Contract Pr�ao Co�ra��Time. ''—n <br />the event the Contractor and the CMAR cannot agree that an adjustment to the Contract* <br />Price or the Contract Time is warranted, or cannot agree on the appropriate adjustment to Contract Price or the Contract Tna.' in order to expedite <br />the'VVorh ond'avoid or <br />minimize delay in the Work that might effect the Contract Price or boOtract T|nle' the <br />Contractor shall, ifoo directed bythe CK8AFtin writing, nevertheless proceed with the Work, <br />and any.ad|uatmentto the Contract Price or Contract Time ahoU be negotiated. bythe <br />parties at a later date' utilizing the dispute resolution procedures under this Agreement � <br />naoemnmr� An>(dg|m for an adjustment in{�oOtroot Price or<�ontnaut Time, �n~de�ned|n- <br />the ��onatructionChange Directive, ohoU bepronnp�vmnodeinwri�nginacc--anc�vv�h <br />the procedures da5nedin/\�|o|e15.2of these CSenm '|Conditions. <br />-�- <br />14.3 The Designer, change's or alterations in the Work not involving change in the Contract Price or in the Contract Time and not inconsistent with <br />may - accomplished - �rdor Contract Documents ^--~-~~ <br />the surety. the Contractor believes that-any minor change the Designer <br />entitles the Contractor toem increase in the Contract Price and/or an extension of Co----- Tlne the Contractor may make a claim therefore oaprovided in Article 14 and/or Article 15 <br />of these General Conditions. <br />� <br />14'4 � or property, no change shall � ' ' <br />life made by the - <br />Contractor except upon prior written Change Order, Construction Change Directive'pr. Field <br />Order authorizing such change. <br />� ' ` <br />29of42 � JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.