that'aotivitv on the Contractor's Construciion Schedule. Time is of the essence with respect to each such activity and Completion <br />13.5 If the Contnador au bm no a construction �� progress n�m or <br />document <br />that indicates or otherwise expresses,*an intention to achieve completion of the Work prior <br />to any Completion Date required by the.Contract Documents or prior to i�� the (�on�ectTime, noUabUi of the (�yW/\[�ho the (�on�acborfor any failure of the 'Contractor to <br />mo complete the Work shall be created orimplied. <br />' <br />13.0 If the Contractor, for naaoone'bevo delayed beginning any <br />activity, activity, the Contractor shall, nevertheless, have the same number of days as �r shown in <br />the Master Schedule for the achvity,'and the affected activity and oodvUx <br />that iodepend�nt upon that activity ohoUbeocUVoted accordingly; pz`ided'---'" any time <br />^ <br />ths�[|MAF�bvrneanoofa Change Onde�may 'require the Contractor bo work overtime, bo <br />increase labor forces or to take a <br />ny.nec0000ryorappropdgteadiontodecreaae the time <br />required for any activity, and the Contractor shall be entitled to an acUuotnlent in the <br />Contract with <br />13.7 At any time, the CMAR may'order the Contractor, on seven (7) days written notioe, to begin <br />any activity earlier than the starting date shown on the Master Schedule. <br />13.8 Should the Contractor fall to start �e start date shown in the Mast <br />Schedule or as � may have been adjusted in' accordance with paragraphs 13.6 or 13' <br />above, or become delayed, the Contractor shall, without being entitled to any increase in <br />the Contract Price or other compensation, work overtime, increase labor forces or take <br />-such other action as may be necessary or appropriate to complete the activity by the <br />Completion Date shown on the Master Schedule, or as such Completion Date may. have <br />been adjusted. <br />13.9 The CMAR shall monitor progress of the Work at all times and the Contractor shall. <br />cooperate with such monitoring and provide any and all information with respect to thd <br />progress of the Work and scheduling aa the CN1AF{ may reasonably require. <br />13.10 On a monthly baeio, in consultation with the Contractor, the CNYARohaU revise '� <br />Ul� � Master - <br />Schedule, showing any adjustments made in accordance with paragraphs 13.6 or 13, <br />ebove, by any Change Order, the pnognaaa of the Work, and any days gained or days lost <br />vvithrespect to any activity, and shall furnish copies thereof bo the (�ontraobor. -'- -- <br />13.11 Should any monthly revision of the Master Schedule show that the Contractor ie behind on <br />any activity, the late completion of which could delay Substantial Completion of the VVod«' <br />the CMAR shall be entitled to withhold from the next Progress Payment due the Contractor <br />an amount sufficient to reimburse the CK4AR for any and all delay damages, should <br />Substantial Completion be delayed by the ooma number of days that the Contractor is <br />currently behind schedule. |f, subsequently, the Contractor's progreaa, as shown by any <br />succeeding monthly revision to the Master Schedule, is such that the anticipated delay no <br />longer exists, the CMAR shall pay with the Progress Payment next. due to the Contractor <br />such amounts aa have been withheld in accordance with this paragraph. <br />13.12 The CK8AR shall have the dohtto Work, hire labor <br />equipment, subcontract ' 'employ --''~'^ <br />/pmmau parties, or that the CMAR deems necessary <br />or appropriate to remedy or ouna any delay by the Contractor in the pnzgroea of the Work. ` <br />Such action by the CMAR shall not, in any way; affect, void or limit any warranty, guaranty <br />or other reeponoibUityof the Contractor under the.ControctDocuments. Such -c�onmay <br />betaken by the CWAF only after. three (3) days written notice to the Contractor, All costs" <br />.incurred by the CMAR'In taking any such � <br />� <br />action oheU b� charged to��h� Contractor and <br />deducted from any amounts remaining due uhder the Agreement. <br />GENERAL CONDITIONS FOR CMATRISK PROJECT 27of42 � JUNE 2OO7.EOFO N <br />