Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maximum Price. The CMAR shall present its findings to the <br />Owner and Designer. Following Owner acceptance, the <br />Designer shall prepare the change order documents for <br />signature by. the CMAR and Owner. Upon execution of the <br />change order documents between the CMAR and Owner, the <br />CMAR shall prepare change order documents for signature by <br />the affected Contractor(s). The CMAR shall verify that any <br />adjustment of time required by approved change orders has <br />been incorporated into the Contractor's Construction Schedule. <br />3.6.11.2 The CMAR shall review the contents of all Contractor - <br />requested changes to the contract time or price, determine <br />whether an adjustment to the Guaranteed Maximum Price or <br />the Master Schedule Is warranted under the Contract, and <br />determine the amount or length, if any, of the allowable <br />adjustment to the Guaranteed Maximum Price and the Master <br />Schedule. If the .CMAR believes that an adjustment to this <br />Contract might be warranted by a Contractor change request, <br />the CMAR shall provide the Designer with a copy of the change <br />request, and - the CMAR shall, in Its evaluations of the <br />Contractor's request, consider the Designer's comments <br />regarding the proposed changes. The CMAR shall present its <br />findings to the Owner and Designer regarding the proposed <br />changes. if, after review by the Owner and Designer, the <br />Owner determines that an adjustment to the Guaranteed <br />Maximum Price or Master Schedule is warranted, the Designer <br />shall prepare the change order documents for signature by the <br />CMAR, the Owner and -the Designer. Upon execution of the <br />change order documents between the CMAR and Owner, the <br />CMAR shall prepare change order documents for signature by <br />the affected Contractor. <br />3.6.11.3 In Instances where a lump sum or unit price is not <br />authorized by the Owner in a change order prior to performing <br />Work described in a request for proposal as provided in <br />Paragraph 3.5.11, the CMAR shall request from the Contractor <br />records of the cost of payroll, materials and equipment and the <br />amount of payments to subcontractors incurred by the <br />Contractor in performing the Work. <br />3.6.12 Trade -Off Studies <br />The CMAR shall provide trade -off studies for various minor <br />construction components. The results of the trade -off studies <br />shall be In report form and distributed to the Owner and <br />Designer. <br />3.6.13 Pro cress Payments <br />Q <br />In consultation with the Designer, the C* MAR shall inspect the <br />work to determine compliance with the Contract Documents, <br />review the monthly payment applications submitted by each <br />Contractor and determine whether the amount requested <br />reflects the progress of the Contractor's Work. The CMAR <br />shall make appropriate adjustments to each payment <br />application and shall prepare and forward to the Designer and <br />Owner a progress payment report. The report shall state the <br />total contract price, payments to date, current payment <br />requested, retainage and actual amounts owed for the current <br />period. Included in this report shall be a certificate of payment <br />that shall be signed by the CMAR and delivered to the Owner. <br />The CMAR shall make payments that are due to all contractors, <br />suppliers, and material men within seven (7) days following <br />payment for the work, supplies and materials by the Owner to <br />the CMAR as provided in Paragraph 7.4.4 . In addition, the <br />CMAR shall keep the Project and the site on which Work is <br />performed free and clear of all liens and claims from <br />Contractors, subcontractors, or suppliers. Each payment <br />application from each Contractor and the CMAR shall contain <br />sales tax information on forms provided by the Owner. <br />3.7 Management information System (MIS) <br />The CMAR shall develop a MIS to establish communication <br />between the Owner, CMAR, Designer, and other parties on the <br />Project. In developing the MIS, the CMAR shall interview the <br />Owner's and the Designer's key personnel and others to <br />determine the type of information for reporting, the reporting <br />format, and the desired frequency for distribution of the various <br />reports. At a minimum, the MIS shall include the elements <br />described in this section. <br />3.7.1 Pre - construction Procedures <br />As part of the MIS, the CMAR shall establish procedures for <br />reporting, communication, and administration during the Design <br />Phase and regulatory permitting. <br />3.7.2 Schedule Maintenance Reports <br />The CMAR shall prepare and distribute schedule maintenance <br />reports on a monthly basis that shall contrast actual progress <br />against scheduled progress for each Phase and the overall <br />Project and shall make recommendations to the Owner for <br />corrective action to maintain the Master Schedule and all <br />design and construction schedules. During the Construction <br />Phase the reports shall compare the actual construction dates <br />to scheduled construction dates of each separate construction <br />contract and to the Master Schedule for the Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.