Browse
Search
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:27:59 PM
Creation date
9/11/2009 12:30:27 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4p
Document Relationships
2009-003 Purchasing - Resolute Building Company - Third Amendment to Agreement for Construction Manager at Risk Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda -11-06-2008 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 11-06-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contnsctor. shall be necessary for the Contractor to coordinate construction activities with <br />such other contnactora, particularly vv� work respect to eocaeo hm �dx areao' storage of <br />matadohs;and use of elevators and ot ercommonfoo|QOam.ThaCmntnaotormha\|di|igently <br />and in good faith cooperate with the CyNAR' the Owner, the Designer, and all other <br />contractors with respect to such matters and shall regularly and faithfully attend any and all <br />meetings called by the [)K8AR with respect to such matters. Any disputes between the <br />Contractor and any other separate prime contractor with respect to such matters shall be <br />resolved in accordance with the claim and dispute resolution procedures in'the-Agreement. <br />ARTICLE 13. CONTRACT TIME <br />13.1 Within fourteen (14) days after* initial receipt of the Construction Agreement by the <br />Contractor for signatures, the Contractor shall prepare and submit to the CMAR for review <br />and approval apns|i'ary<�ontnacto�a(�oOetn�oton8chadu|e�vthaVYorkpurouont <br />nn the <br />requirements stated in the Contract Documents. <br />13.2 Within fourteen M4\ i <br />Contractor for S*ig natures, 'the. Contractor shall submit to the CMAR a Submittal Register <br />listing all Submittals the Contractor is required to make or proposes to make under the <br />Contract Documents, the dates on which the Contractor proposes to make such Submittals <br />and the dates by which the Contractor reasonably requires a response from the CMAR and <br />the Designer with respect to each Submittal. The dates submitted shall be incorporated into <br />the Contractor's Construction Schedule as Completion Dates when they have been <br />approved or modified by th6'Owner i . The CMAR and the Designer shall not be required to <br />review any Submittal from the' Contractor until a Submittal, Register acceptable to and � <br />approved bv the CK8AFl has been..oubmittedby the Contractor. <br />13.3 Not later than thirty (8O1 � ' '' � <br />--" ,'-, �gyn�YoUovYng o��cVUoO and delivery of the Construction <br />Agreement by the CMAR to the Contractor, the CMAR shall deliver to the Contractor <br />Notice to Proceed. The Notice b} Proceed shall mtate.e. commencement date on which it}m <br />expected that the Contractor will begin the Work to be performed under the Agreem ent. <br />The Contract Time shall. be meeuurmd* from said .specified commencement date.. The <br />commencement date stated in the Notice to Proceed shall not be earlier than three (3) days <br />after the Notice to Proceed |o�eryadon the <�on�aubor. <br />If, other than by mutual ` <br />' . said <br />(30) days'after the date of execution and delivery'of the Agreement from the CMAR to the <br />Contractor and the Contractor believes said delay justifies an increase in Contract Price <br />and/or an extension of Contract'Time,- the Contractor may make a claim therefore as <br />provided in Article 14 and/or Article 15 of these General Conditions. <br />No Work shall bedone prior ho the date specified in the Notice toProceed <br />The Contractor shall submit a final Contractor ' Construction Schedule for approval by the <br />CMARnolater than fourteen (14)days after issuance of the Notice toProceed. No <br />payments shall be due the Contractor until this schedule |o approved bv the CyWAR. <br />13A The Master Schedule is a Contract Uocurient' ' Contractor represents that the Master <br />Schedule has been reviewed in'detaU and taken into account in preparing its bid. The' <br />Contractor's Construction Schedule shall be incorporated into the CM/ s Project <br />Schedule. The Contractor's Construction Schedule shall include all of its activities which <br />impact, limit, or.otherwise affeot'the�Um completion of the Project as shown in the <br />K800barSchedule, and oUof the ac�vUma*pf ' mwhich impact, limit, orotherwioasffecL <br />.the ntart, duration, or completion *of*the Contractor's activities. The Contractor. further <br />thatthe can and will oonn each time shown � that. the � �� ' � ' ` <br />� <br />GENERAL CONDITIONS FOR CM � AT RISK PROJECT' `2O -of �42� ' JUNE 2OO7EDITION <br />� � <br />
The URL can be used to link to this page
Your browser does not support the video tag.